Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply quick changeover procedures
Apply quick changeover procedures
Unit of competency
National Code
MSS402022
MSS402022
State Code
OER50
OER50
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
03/05/2023
Field of Education
080307 - Organisation Management
Original Release Date
03/05/2023
Nominal Hours
30
Description
This unit describes the skills and knowledge required to prepare for and apply quick changeover according to procedures.This unit applies to individuals who are required to apply quick changeover of equipment, processes, batches, product or service type or other aspects of the work. This unit applies to any organisation that is implementing quick changeover, typically within competitive systems and practices. This unit may not be applicable to a totally continuous operation producing only one product, or simultaneous range of products. The unit is also not applicable to a maintenance/pressure vessel inspection shutdown as experienced by continuous process manufacturers.No licensing or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1. Prepare for changeover
- 1.1 Determine when changeover will be required
- 1.2 Review plans and instructions for quick changeover
- 1.3 Identify role of others in quick changeover
- 1.4 Obtain and organise all tools, parts and materials required for changeover
- 1.5 Organise changeover process taking into account internal and external set-up activities
- 1.6 Identify quality specifications and targets relevant to changeover
2. Make quick changeover
- 2.1 Plan changeover according to quick changeover principles
- 2.2 Liaise and work with relevant people in quick changeover
- 2.3 Complete changeover according to procedures
- 2.4 Check output meets specification
- 2.5 Debrief with all relevant stakeholders
- 2.6 Note any steps which result in waste
- 2.7 Recommend changes to reduce waste
3. Improve work health and safety (WHS)
- 3.1 Identify hazards to self or others in all steps or actions in changeover process
- 3.2 Determine risks from each hazard
- 3.3 Identify actions which may be performed in a more ergonomic manner
- 3.4 Recommend changes to improve WHS
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAK52 | MSS402020 | Apply quick changeover procedures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BIJ7 | MSF20322 | Certificate II in Cabinet Making and Timber Technology | Qualification |
| BIR6 | MSS30322 | Certificate III in Competitive Systems and Practices | Qualification |
| BFP4 | UEE40720 | Certificate IV in Electronics and Communications | Qualification |
| BFO7 | UEE30920 | Certificate III in Electronics and Communications | Qualification |
| BFQ2 | UEE60220 | Advanced Diploma of Electronics and Communications Engineering | Qualification |
| BFP5 | UEE50520 | Diploma of Electronics and Communications Engineering | Qualification |
| BIV7 | MEM30522 | Certificate III in Engineering - Technical | Qualification |
| BHM1 | PPM30121 | Certificate III in Pulp and Paper Operations | Qualification |