Qualification Outline
22/07/2026 10:24 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate III in Urban Pest Management
Certificate III in Urban Pest Management
CPP30115
AWO4
Replaced
Transition (Replaced)
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 1.00 | 08/09/2015 | Current | Transition (Replaced) |
Description
This qualification reflects the roles of pest management technicians who are required to identify common urban pests, assess pest problems, consider pest management options, develop pest management plans, liaise with customers and implement pest management strategies.
In most cases, the technician will work alone and have responsibility for managing chemicals and equipment used in pest management as well as for a pest management vehicle, including the vehicle storage area.
Licensing, legislative, regulatory or certification requirements apply to pest management in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
^ From 1 July 2022 the elective unit HLTAID003 must no longer be delivered and will be replaced in the Packaging Rules by the unit HLTAID011 - for more information see: https://asqa.gov.au/news-events/news/reminder-about-superseded-hlt-first-aid-units
Schedule
Packaging Rules
To achieve this qualification, competency must be demonstrated in:- thirteen (13) units of competency:
- nine (9) core units
- four (4) elective units.
The elective units must ensure the integrity of the AQF alignment and contribute to a valid, industry-supported vocational outcome and are to be chosen as follows:
- up to four (4) units and no less than two (2) units from the elective units listed below
- up to two (2) units from other Certificate III or Certificate IV qualifications in CPP, or another current Training Package or accredited course, provided they do not duplicate the outcome of another unit chosen for the qualification.
1. Core Units
All nine (9) units must be completed.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| AVE18 | CPPPMT3002 | Assess, advise on options, and develop pest management plans for complex or high risk operations | 25 | Unit of competency |
| AVE10 | CPPPMT3007 | Implement pest management plans for complex or high risk operations | 20 | Unit of competency |
| AVE19 | CPPPMT3018 | Maintain equipment and pesticide storage area in pest management vehicles | 50 | Unit of competency |
| AVE13 | CPPPMT3017 | Maintain, service and repair pest management equipment | 10 | Unit of competency |
| AVE11 | CPPPMT3006 | Manage pests by applying pesticides | 80 | Unit of competency |
| AVE15 | CPPPMT3005 | Manage pests without applying pesticides | 40 | Unit of competency |
| AVE14 | CPPPMT3043 | Prepare and present pest management proposals for complex or high risk operations | 25 | Unit of competency |
| AVE17 | CPPCMN3004 | Respond to enquiries and complaints | 20 | Unit of competency |
| AVE20 | CPPPMT3026 | Select pest management vehicle and equipment | 15 | Unit of competency |
2. Elective Units
- up to four (4) units and no less than two (2) units from the elective units listed below
- up to two (2) units from other Certificate III or Certificate IV qualifications in CPP, or another current Training Package or accredited course, provided they do not duplicate the outcome of another unit chosen for the qualification.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| AVE24 | CPPPMT3010 | Control timber pests | 40 | Unit of competency |
| AVE23 | CPPPMT3008 | Inspect for and report on timber pests | 40 | Unit of competency |
| AVE12 | CPPPMT3042 | Install physical termite management systems | 30 | Unit of competency |
| AUK88 | BSBSMB407 | Manage a small team | 40 | Unit of competency |
| AVE21 | CPPPMT3011 | Manage organisms by applying fumigants to commodities and environments | 80 | Unit of competency |
| AVE16 | CPPPMT3019 | Organise and monitor pest management operations | 25 | Unit of competency |
| AVE22 | CPPPMT3029 | Plan and schedule pest management operations | 30 | Unit of competency |
| WG732 | HLTAID003 | Provide first aid | 20 | Unit of competency |
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D766 | CPP30911 | Certificate III in Pest Management | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEX4 | CPP30119 | Certificate III in Urban Pest Management | Qualification |
No information
Entry Requirements
There are no entry requirements for this qualification.
Traineeships and Apprenticeships