Unit of competency Outline
Date retreived
23/07/2026 12:04 AM AWST
23/07/2026 12:04 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Distribute tailings
Distribute tailings
Unit of competency
National Code
RIIWBP202A
RIIWBP202A
State Code
WB741
WB741
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
11/02/2010
Field of Education
030303 - Mining Engineering
Original Release Date
11/02/2010
Nominal Hours
20
Description
This unit covers distribution of tailings in coal and metalliferous mining and extractive industries. It includes: planning and preparing; starting up equipment; monitoring and dispersing tailings; conducting housekeeping activities; and shutting down and/or isolating equipment.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to distribution of tailings
- 1.2. Receive, interpret and clarify shift changeover details
- 1.3. Communicate with other personnel using approved communication methods
- 1.4. Select personal protective equipment appropriate for work activities
- 1.5. Select appropriate type of auxiliary equipment for work activities
- 1.6. Perform equipment pre-start checks
- 1.7. Identify, address and report potential risks and hazards
- 1.8. Identify, address and report environmental issues
- 1.9. Adhere to emergency procedures
- 1.10. Use approved dust suppression and extraction methods
- 1.11. Prepare site for positioning of equipment
- 1.12. Position and stabilise equipment according to work plan
2. Start-up equipment in sequence
- 2.1. Carry out start-up procedures and complete start-up checks according to plant configurations and system requirements
- 2.2. Confirm plant is operational
3. Monitor and disperse tailings
- 3.1. Read and interpret data from equipment indicators to determine deposition parameters
- 3.2. Continuously inspect plant and identify defects and potential problems
- 3.3. Adjust equipment to approved operating parameters to optimise performance, maintain efficiency and to meet tailings quality targets
- 3.4. Control feed to equipment
- 3.5. Monitor bunded areas and manage overflows
- 3.6. Complete all required documentation
- 3.7. Identify, address and report hazards
- 3.8. Report spillages to meet environmental guidelines
- 3.9. Pass on end of shift information to oncoming shift
- 3.10. Ensure tailings meet fill plant operating parameters
4. Conduct housekeeping activities
- 4.1. Clean equipment to maintain condition of equipment and ensure safe and efficient operations
- 4.2. Clean and store auxiliary service equipment
5. Shutdown in sequence and/or isolate equipment
- 5.1. Flush lines to remove all material
- 5.2. Shutdown or isolate equipment based on process and safety requirements
- 5.3. Perform post shutdown or isolation checks
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and Workplace Relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Auxiliary equipment may be anything that is portable and mobile that is not part of the fixed infrastructure: These may include:
compressors
cyclones
hand and power tools
hoses (water and air)
lines and ropes
loaders, pontoons, boats
thickening agents (e.g. de-scaling)
Pre-start checks may include:
availability of equipment
detection of conditions that are unusual
drive through plant
personnel availability
Environmental issues may include:
drainage
dust
emissions
flora and fauna
hazardous chemicals
recycling (e.g. water)
run-off/spills
waste management and disposal
water quality
Start-up procedures may include:
checking interlocks
checks distribution control system (DCS)
chutes
drive belts
isolations
material transfer system condition (e.g. leaks, blockages)
pumping system
remote systems (e.g. telemetry)
valves
Plant may include:
decant towers and ponds
pumps and siphons
spigots
tailings pipeline
valves
Indicator readings may measure:
concentration (e.g. cyanide)
current
density
flow
levels
pressure
speed (e.g. pump)
unusual noises
Monitoring may include the checking of:
blockages
current draw
detecting noises and smells
flow rates
missing components (e.g. spigots)
overloads
pressures
spillages
wear and tear
Overflow areas may include:
collection dams
scour pits
Cleaning methods may include:
hosing with water
Materials may include:
reagents
slurry
tailings
water
Post-shutdown checks are:
beaching
density
location of discharge points
regulate decant water removal
relocation of spigots
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and Workplace Relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Auxiliary equipment may be anything that is portable and mobile that is not part of the fixed infrastructure: These may include:
compressors
cyclones
hand and power tools
hoses (water and air)
lines and ropes
loaders, pontoons, boats
thickening agents (e.g. de-scaling)
Pre-start checks may include:
availability of equipment
detection of conditions that are unusual
drive through plant
personnel availability
Environmental issues may include:
drainage
dust
emissions
flora and fauna
hazardous chemicals
recycling (e.g. water)
run-off/spills
waste management and disposal
water quality
Start-up procedures may include:
checking interlocks
checks distribution control system (DCS)
chutes
drive belts
isolations
material transfer system condition (e.g. leaks, blockages)
pumping system
remote systems (e.g. telemetry)
valves
Plant may include:
decant towers and ponds
pumps and siphons
spigots
tailings pipeline
valves
Indicator readings may measure:
concentration (e.g. cyanide)
current
density
flow
levels
pressure
speed (e.g. pump)
unusual noises
Monitoring may include the checking of:
blockages
current draw
detecting noises and smells
flow rates
missing components (e.g. spigots)
overloads
pressures
spillages
wear and tear
Overflow areas may include:
collection dams
scour pits
Cleaning methods may include:
hosing with water
Materials may include:
reagents
slurry
tailings
water
Post-shutdown checks are:
beaching
density
location of discharge points
regulate decant water removal
relocation of spigots
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the distribution of tailings
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of the distribution of tailings
working with others to undertake and complete the distribution of tailings that meets all of the required outcomes
consistent timely completion of the distribution of tailings that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the distribution of tailings
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the distribution of tailings
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of the distribution of tailings
working with others to undertake and complete the distribution of tailings that meets all of the required outcomes
consistent timely completion of the distribution of tailings that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the distribution of tailings
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2407 | MNMPGP205A | Distribute tailings | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH744 | RIIWBP202D | Distribute tailings | Unit of competency |