Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out a train roll-by inspection
Carry out a train roll-by inspection
Unit of competency
National Code
TLIB0014
TLIB0014
State Code
ODP74
ODP74
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
14/03/2022
Field of Education
039907 - Rail Operations
Original Release Date
14/03/2022
Nominal Hours
20
Description
This unit involves the skills and knowledge required to carry out a train roll-by inspection in accordance with workplace policies and procedures, and relevant system of safeworking requirements.It includes preparing and conducting a visual roll-by inspection of crossing/passing trains from the ground or on-train to identify equipment, load security or other defects or failure, and reporting and/or actioning the inspection results.Work is performed under some supervision generally within a team environment.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for roll-by inspection
- 1.1 Inspection instruction is confirmed in accordance with workplace procedures
- 1.2 Position is taken at planned time to complete roll-by inspection without personal risk
- 1.3 Conditions are assessed and necessary actions are taken to ensure roll-by inspection will be effective
2 Conduct roll-by inspection
- 2.1 Identification and status of train is confirmed with relevant personnel
- 2.2 Condition of rolling stock is inspected and faults identified and reported in accordance with workplace procedures
- 2.3 Communication is maintained with relevant personnel to ensure safe, efficient and complete roll-by inspection
- 2.4 Inspection is conducted in accordance with work health and safety (WHS)/occupational health and safety (OHS), rail network owner and/or workplace policies and procedures to prevent injury and damage
- 2.5 Faults requiring immediate actions are noted and appropriate actions are taken to stop train
3 Report and action roll-by inspection results
- 3.1 Appropriate personnel are informed of roll-by inspection results and any faults or defects requiring rectification
- 3.2 Inspection results are recorded, reported and/or filed, as required, in accordance with workplace policies and procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVK25 | TLIB4078 | Carry out a train roll-by inspection | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHI7 | TLI33221 | Certificate III in Terminal Train Driving | Qualification |
| BHX8 | TLI42622 | Certificate IV in Train Driving | Qualification |
| BHG7 | TLI42621 | Certificate IV in Train Driving | Qualification |