Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Maintain pipeline easements

Maintain pipeline easements

Unit of competency
National Code
PMASUP241A
State Code
C6041
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/11/2002
State Implementation and Classification
Approved Date
23/04/2004
Field of Education
030717 - Plant And Machine Operations
Original Release Date
23/04/2004
Nominal Hours
20
Description
Notes
Elements and Performance Criteria
No information
Context
This unit of competency includes all such items of equipment and unit operations which are utilised in the maintenance of pipeline easements. For your enterprise this may include:
light aircraft (pilot provided)
off road vehicles
gas leakage detectors
vegetation control documentation
workplace mapping, e.g. pipeline alignment drawings, topographical maps, geographical maps
pipeline access route manuals
MSDS information
operating procedures.

Typical problems for your enterprise may include:
isolation and risk of exposure
gas or fluid leaks
accidental or geophysical rupturing of pipelines.

HSE
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.
Assessment context and methods
Assessment for this unit of competency will be on an operating pipeline. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, which will include disruptions to normal, smooth operation.

Simulation may be required to allow for timely assessment of parts of this unit of competency (e.g. elements 1 and 4). Simulation should be based on the actual plant and will include walk throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios, role plays and 3D virtual reality interactive systems. In the case of evacuation training or training for competencies practised in life threatening situations, simulation may be used for the bulk of the training.

This unit of competency requires an application of the knowledge contained in the use of the pipeline and its integral equipment, to the level needed to maintain control and recognise and resolve problems. This can be assessed through questioning and the use of what if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.

Critical aspects
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.

Consistent performance should be demonstrated. In particular look to see that:
early warning signs of pipeline easements needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is planned and implemented to rectify identified problems
effective communication and interpersonal skills are used in relation to third party liaison activities.

These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of pipelines, incidents on similar pipelines around the world, hazard analysis activities and similar sources.

Resource implications
Assessment will require access to pipeline easements and pipeline maintenance work sites over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Other assessment advice
It may be appropriate to assess this unit concurrently with relevant teamwork and communication units.

Consider co-assessment with:
PMASUP220A - Monitor and control environmental hazards
PMASUP242A - Monitor pipeline civil works
PMASUP236A - Operate vehicles in the field.

Essential knowledge
The knowledge referred to in the evidence guide for this unit includes:
appropriate local knowledge
specific environmental procedures and requirements
legal obligations and standing of both parties as it relates to access rights
knowledge of the pipeline system and access routes
appropriate and safe vegetation control techniques
erosion control techniques
company and legislative environmental policies, practices and procedures
pipeline signage and application requirements.

Competence also includes the ability to isolate the causes of problems to the pipeline and to distinguish between causes of problems/alarms/fault indications such as:
various disturbances on or in the easement
visual evidence of a pipeline rupture
erosion and subsidence.
Replaces
State Code National Code Title Type
C0878 PMAHYD232A Maintain pipeline easements Unit of competency
Replaced By
State Code National Code Title Type
W8939 PMASUP241B Maintain pipeline easements Unit of competency