Unit of competency Outline

Date retreived
22/07/2026 11:28 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Carry out track ballasting

Carry out track ballasting

Unit of competency
National Code
TLIS2030
State Code
AVH80
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/01/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
23/02/2016
Nominal Hours
35
Description
This unit involves the skills and knowledge required to carry out track ballasting manually and mechanically in accordance with safeworking and regulatory requirements, and workplace procedures.It includes determining the job requirements, carrying out the ballast activity in accordance with work orders, and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under some supervision, generally within a team environment. It involves the application of routine operational principles and procedures when carrying out track ballasting, as part of workplace activities across a variety of operational contexts within the Australian rail system.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.
Notes
Elements and Performance Criteria
1 Determine job requirements
  • 1.1 Worksite is identified
  • 1.2 Hazards are identified, risks are assessed and control measures are implemented
  • 1.3 Work method is selected to meet job requirements
  • 1.4 Resources are identified to meet the scope of the job and work methods selected
2 Undertake ballast activity
  • 2.1 Ballast is removed from track using appropriate methods and equipment, in accordance with workplace procedures
  • 2.2 Ballast profile is established through repair of existing ballast and/or distribution of new ballast using appropriate methods and equipment, in accordance with workplace procedures
  • 2.3 Work is completed to meet ballast profile requirements to ensure safe operation of trains in accordance with workplace procedures
3 Complete documentation
  • 3.1 Required documentation procedures and processes are confirmed
  • 3.2 Documentation is filled in legibly and proofread
  • 3.3 Documentation is processed in accordance with workplace requirements
No information