Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare design of spray seal surfacing

Prepare design of spray seal surfacing

Unit of competency
National Code
RIICWD524D
State Code
WH216
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
28/05/2014
Field of Education
040103 - Urban Design And Regional Planning
Original Release Date
28/05/2014
Nominal Hours
60
Description
This unit describes a participant’s skills and knowledge required to prepare design of spray seal surfacing in Civil construction.This unit is appropriate for those working in management or in technical specialist roles.No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for the design of sprayed seal surfacing
  • 1.1 Access, interpret and apply design of spray seal surfacing documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and confirm the sprayed seal surfacing project requirements and information
  • 1.4 Prepare a design plan which makes best use of the available resources
2. Undertake the design of sprayed seal surfacing
  • 2.1 Interpret and analyse data and identify viable options
  • 2.2 Interpret and analyse data and recommend the preferred option
  • 2.3 Complete the design
  • 2.4 Prepare a cost estimate for execution of the design
  • 2.5 Participate in the review of the design
  • 2.6 Complete required documentation
  • 2.7 Monitor and coordinate the progress of other team members involved in the design process
  • 2.8 Gain design approval
3. Finalise design processes of sprayed seal surfacing
  • 3.1 Ensure filing of design records is completed
  • 3.2 Complete and submit design cost and other reporting
  • 3.3 Participate in performance review of the design process
  • 3.4 Seek client feedback and contribute to the verification of the design
  • 3.5 Close out all systems
4. Support and review the application of the design of sprayed seal surfacing
  • 4.1 Provide clarification and advice to those applying the design
  • 4.2 Review the application of the design and recommend changes for continuous improvement
  • 4.3 Contribute to the validation of the design
No information
No information
Replaces
State Code National Code Title Type
WC344 RIICWD524B Prepare design of sprayed seal surfacing Unit of competency
Replaced By
State Code National Code Title Type
OCY13 RIICWD524E Prepare design of spray seal surfacing Unit of competency