Unit of competency Outline
Date retreived
23/07/2026 1:15 AM AWST
23/07/2026 1:15 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Slump test concrete
Slump test concrete
Unit of competency
National Code
CPCCCO3053A
CPCCCO3053A
State Code
WI738
WI738
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to slump test concrete to ensure the mix is workable and complies with the delivery docket and specified order.The unit includes sampling and slump testing to a set range or tolerance. It may also include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.
- 1.2 Tools and equipment consistent with the job are selected, checked for serviceability, and faults are rectified and reported before work begins.
- 1.3 Material quantity requirements are identified, calculated and confirmed according to plans, specifications and quality requirements.
- 1.4 Environmental requirements are identified for the project according to environmental plans and regulatory obligations.
- 1.5 Standard slumping cone is cleaned in preparation for slump testing.
2 Test concrete slump measurement.
- 2.1 Sample of concrete is taken, using the correct sampling procedure, directly from the delivery truck’s initial discharge.
- 2.2 Slumping cone is filled and compacted according to standard slump testing procedures.
- 2.3 Slumping cone is levelled off and surplus concrete is cleared from steel plate and slumping cone.
- 2.4 Slumping cone is raised without moving the sample.
- 2.5 Sample is measured for conformity with tolerance levels and resampling is conducted if sample is outside tolerance.
- 2.6 Collapsed or sheared samples are recorded.
3 Clean up.
- 3.1 Work area is cleared and materials disposed of, reused or recycled according to regulations, codes of practice and job specification.
- 3.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
- 3.3 Work completion procedures are applied and relevant personnel notified that work is finished.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
diagrams or sketches
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to slump testing concrete
relevant Australian standards
safe work procedures relating to slump testing concrete
safety data sheets
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
bullet nosed rod (600mm x 16mm)
sampling scoops
standard slump cones
steel rule
steel slump plate (500mm x 500mm)
steel rod
may include:
brushes
buckets
sponges
trowels, including steel trowels
wooden floats.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications, where specified
relevant regulations and Australian standards
workplace operations and procedures.
Environmental requirements may include:
clean-up management
dust and noise control
vibration management
waste management.
Sampling:
must include that taken at initial discharge after 0.2 square metre of the load has been placed
may include routine samples taken at three places during the load
requires a standard slumping cone 200mm in diameter at the base, 100mm in diameter at the top and 300mm tall, with foot pieces for standing on while the sample is added.
Slump testing mustinclude:
use of a steel tray and steel rod
appropriate frequency of rodding to ensure penetration of concrete layers.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
diagrams or sketches
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to slump testing concrete
relevant Australian standards
safe work procedures relating to slump testing concrete
safety data sheets
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
bullet nosed rod (600mm x 16mm)
sampling scoops
standard slump cones
steel rule
steel slump plate (500mm x 500mm)
steel rod
may include:
brushes
buckets
sponges
trowels, including steel trowels
wooden floats.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications, where specified
relevant regulations and Australian standards
workplace operations and procedures.
Environmental requirements may include:
clean-up management
dust and noise control
vibration management
waste management.
Sampling:
must include that taken at initial discharge after 0.2 square metre of the load has been placed
may include routine samples taken at three places during the load
requires a standard slumping cone 200mm in diameter at the base, 100mm in diameter at the top and 300mm tall, with foot pieces for standing on while the sample is added.
Slump testing mustinclude:
use of a steel tray and steel rod
appropriate frequency of rodding to ensure penetration of concrete layers.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by observation in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
conduct three slump tests from different batches of concrete, to determine if the mix is workable and complies with the delivery docket and specified order
determine when slump test fails and steps to take to communicate test outcomes to relevant personnel
locate, interpret and apply relevant information, standards and specifications relating to slump testing
comply with site safety plans and procedures
comply with organisational policies and procedures relating to conducting slump tests
safely and effectively operate and use plant, tools and equipment required to slump test concrete
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed by observation in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
conduct three slump tests from different batches of concrete, to determine if the mix is workable and complies with the delivery docket and specified order
determine when slump test fails and steps to take to communicate test outcomes to relevant personnel
locate, interpret and apply relevant information, standards and specifications relating to slump testing
comply with site safety plans and procedures
comply with organisational policies and procedures relating to conducting slump tests
safely and effectively operate and use plant, tools and equipment required to slump test concrete
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7371 | CPCCCO3033A | Slump test concrete | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAP38 | CPCCCO3053 | Slump test concrete | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J784 | CPC30313 | Certificate III in Concreting | Qualification |