Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct pile driving operations
Conduct pile driving operations
Unit of competency
National Code
RIICFW304E
RIICFW304E
State Code
OCX51
OCX51
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030717 - Plant And Machine Operations
Original Release Date
18/06/2021
Nominal Hours
32
Description
This unit describes the skills and knowledge required to conduct pile driving operations in civil construction. This includes conducting pre-start checks, protecting areas for pile driving, driving timber and pre-cast concrete piles, using pile hammering methods and dismantling and relocating piling rigs.It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to conduct pile driving operations
- 1.1 Obtain, interpret and confirm work instructions
- 1.2 Access, interpret and apply documentation required to conduct pile driving operations and confirm work activity is compliant
- 1.3 Obtain and interpret emergency procedures and identify steps required to respond to emergencies
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
- 1.6 Identify potential hazards and environmental issues, implement control measures within scope of own role and escalate where required
- 1.7 Select plant, tools and equipment required to carry out tasks and check for faults
- 1.8 Identify, confirm, and locate materials required for work application
2. Locate pile positions and establish piling rig plant
- 2.1 Establish location for piles from reference points and set out according to job requirements
- 2.2 Establish plant and equipment in position and conduct pre-start checks according to job requirements
- 2.3 Prepare and confirm pile conformity according to job requirements
- 2.4 Identify and protect area for pile driving according to job and site requirements
3. Drive and join pile
- 3.1 Set up piling rig and drive pile into position according to job requirements
- 3.2 Conduct splicing according to job requirements
4. Remove piling rig
- 4.1 Dismantle plant and equipment according to manufacturer specifications
- 4.2 Relocate piling rig for next piling installation
5. Conduct clean-up activities
- 5.1 Clear work area and dispose of or recycle materials according to job requirements
- 5.2 Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH095 | RIICFW304D | Conduct pile driving operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |
| BGL6 | RII31220 | Certificate III in Civil Foundations | Qualification |