Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct pile driving operations
Conduct pile driving operations
Unit of competency
National Code
RIICFW304D
RIICFW304D
State Code
WH095
WH095
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
29/05/2014
Nominal Hours
32
Description
This unit describes a participant’s skills and knowledge required to conduct pile driving operations in Civil Construction.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1 Access, interpret and apply pile driving documentation and ensure the work activity is compliant
- 1.2 Obtain, interpret, clarify and confirm work instructions before proceeding
- 1.3 Confirm and apply environmental protection and safety requirements
- 1.4 Obtain, interpret and implement traffic management signage requirements
- 1.5 Select, and check for faults, plant, tools and equipment to carry out tasks
- 1.6 Select and wear correct personal protective equipment appropriate for work activities
- 1.7 Identify, address and report environmental issues, potential hazards and risks
- 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Locate pile positions and establish piling rig plant
- 2.1 Establish location for piles from reference points and set out
- 2.2 Establish plant and equipment in position and conduct pre-start checks
- 2.3 Prepare and check pile for conformity
- 2.4 Identify and protect area for pile driving
3. Drive pile
- 3.1 Manoeuvre pile into position using the piling rig
- 3.2 Set up piling rig and drive pile into place
- 3.3 Carry out splicing or jointing
4. Remove piling rig
- 4.1 Dismantle plant and equipment
- 4.2 Relocate piling rig in preparation for next piling installation
5. Clean up
- 5.1 Clear work area and dispose of or recycle materials
- 5.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB693 | RIICFW304A | Conduct pile driving operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX51 | RIICFW304E | Conduct pile driving operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFA8 | RII30919 | Certificate III in Civil Construction | Qualification |
| AZB0 | RII30915 | Certificate III in Civil Construction | Qualification |
| AZE0 | RII31215 | Certificate III in Civil Foundations | Qualification |
| J634 | RII31213 | Certificate III in Civil Foundations | Qualification |