Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Strip pile heads
Strip pile heads
Unit of competency
National Code
RIICBM201A
RIICBM201A
State Code
WB676
WB676
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/01/2010
Field of Education
030901 - Construction Engineering
Original Release Date
19/01/2010
Nominal Hours
16
Description
This unit covers the stripping of pile heads in the civil construction industry. It includes planning and preparing, stripping pile heads, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task
- 1.3. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.4. Identify, obtain and implement signage requirements from the project traffic management plan
- 1.5. Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.6. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
2. Strip pile heads
- 2.1. Check work platform and false work in preparation for pile head stripping procedures
- 2.2. Determine and mark specified height of pile cut-off
- 2.3. Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling
- 2.4. Attach pile excess to a crane with a sling
- 2.5. Strip back concrete above the groove from steel bars/stands without damage to the reinforcing
- 2.6. Cut steel reinforcing to specified length, and bend to project drawings and specifications
3. Clean up
- 3.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
- 3.2. Clean, check, maintain and store plant, tools and equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevantcompliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation
Site may include:
any rural or urban bridge construction project
multi-span and single span bridges either over water or over land
Signage requirements may include:
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Traffic may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Plant, tools and equipment may include:
cut off saws
jack hammers
scabblers
compressors
hoses
tape measures
marking equipment
crow bars
bending pipes
scaffolding
ladders
slings
cranes
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean up management
Pile head stripping procedures may include:
identifying the height to be cut
using a cut off saw to make an access cut to a specified depth around the pile
using a jack hammer to remove the bulk of concrete from the pile
using a scabbler to expose the reinforcement
bending the reinforcement to tie with the footing/pile cap/abutment reinforcement
Relevantcompliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation
Site may include:
any rural or urban bridge construction project
multi-span and single span bridges either over water or over land
Signage requirements may include:
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Traffic may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Plant, tools and equipment may include:
cut off saws
jack hammers
scabblers
compressors
hoses
tape measures
marking equipment
crow bars
bending pipes
scaffolding
ladders
slings
cranes
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean up management
Pile head stripping procedures may include:
identifying the height to be cut
using a cut off saw to make an access cut to a specified depth around the pile
using a jack hammer to remove the bulk of concrete from the pile
using a scabbler to expose the reinforcement
bending the reinforcement to tie with the footing/pile cap/abutment reinforcement
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for stripping pile heads
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of pile head stripping
working with others to undertake and complete the stripping of pile heads that meets all of the required outcomes
consistent timely completion of pile heads stripping that safely, effectively and efficiently meets the required outcomes
completion of the set out and stripping of a minimum of six pile heads to design specifications
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the stripping of pile heads
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for stripping pile heads
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of pile head stripping
working with others to undertake and complete the stripping of pile heads that meets all of the required outcomes
consistent timely completion of pile heads stripping that safely, effectively and efficiently meets the required outcomes
completion of the set out and stripping of a minimum of six pile heads to design specifications
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the stripping of pile heads
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2032 | BCCBM2001B | Strip pile heads | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH038 | RIICBM201D | Strip pile heads | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W675 | RII31109 | Certificate III in Bridge Construction and Maintenance | Qualification |