Unit of competency Outline
Date retreived
22/07/2026 7:59 AM AWST
22/07/2026 7:59 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Strip pile heads
Strip pile heads
Unit of competency
National Code
RIICBM201D
RIICBM201D
State Code
WH038
WH038
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
27/05/2014
Nominal Hours
16
Description
This unit describes a participant’s skills and knowledge required to apply strip pile heads in Civil construction.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to strip pile heads
- 1.1 Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant
- 1.2 Obtain, interpret and clarify/confirm work instructions before commencing
- 1.3 Confirm and apply environmental protection and safety requirements
- 1.4 Obtain, interpret and implement traffic management signage requirements
- 1.5 Select and check for faults, plant, tools and equipment to carry out tasks
- 1.6 Identify, address and report environmental issues, potential hazards and risks
- 1.7 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
2. Strip pile heads
- 2.1 Check work platform and false work in preparation for pile head stripping
- 2.2 Determine and mark specified height of pile cut-off
- 2.3 Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling
- 2.4 Attach pile excess to a crane with a sling
- 2.5 Strip back concrete above the groove from steel bars/stands without damage to the reinforcing
- 2.6 Cut steel reinforcing to specified length, and bend to project drawings and specifications
3. Clean up
- 3.1 Clear work area and dispose of or recycle materials
- 3.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB676 | RIICBM201A | Strip pile heads | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX41 | RIICBM201E | Strip pile heads | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFA8 | RII30919 | Certificate III in Civil Construction | Qualification |
| AZB0 | RII30915 | Certificate III in Civil Construction | Qualification |