Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Strip pile heads
Strip pile heads
Unit of competency
National Code
RIICBM201E
RIICBM201E
State Code
OCX41
OCX41
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
16
Description
This unit describes the skills and knowledge required to strip pile heads in civil construction, including setting, stripping, cleaning and performing maintenance on pile heads.It applies to those working in operational roles. They generally work under supervision to undertake a prescribed range of functions involving known routines and procedures and take some responsibility for the quality of work outcomes. Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to strip pile head
- 1.1 Obtain, interpret and confirm work instructions
- 1.2 Access, interpret and apply documentation required to strip pile heads
- 1.3 Obtain and interpret emergency procedures and identify steps required to respond to emergencies
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
- 1.6 Identify, address and report environmental issues, potential hazards and risks
- 1.7 Select plant, tools and equipment required to carry out tasks and check for faults
- 1.8 Identify, confirm and locate materials required for work application
2. Cut and strip pile head
- 2.1 Check work platform and false work in preparation for pile head stripping
- 2.2 Determine and mark specified height of pile cut-off according to job requirements
- 2.3 Cut horizontal groove to specified depth at marked height according to job requirements
- 2.4 Attach pile excess to crane with sling
- 2.5 Strip back concrete above groove from steel bars without damaging reinforcing
- 2.6 Cut steel reinforcing to specified length and bend according to project drawings and specifications
3. Conduct clean-up activities
- 3.1 Clear work area and dispose of or recycle materials according to site requirements
- 3.2 Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH038 | RIICBM201D | Strip pile heads | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |