Unit of competency Outline
Date retreived
22/07/2026 8:12 AM AWST
22/07/2026 8:12 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Produce complex folded and glued cartons
Produce complex folded and glued cartons
Unit of competency
National Code
ICPCBF309
ICPCBF309
State Code
AUM94
AUM94
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030717 - Plant And Machine Operations
Original Release Date
16/09/2015
Nominal Hours
60
Description
This unit describes the skills and knowledge required to produce complex folded and glued products while maintaining the production process and machinery operation.It applies to individuals who work under direct supervision with limited responsibility in preparing materials and equipment and resolving issues to produce a finished product.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Maintain operation of carton blank system
- 1.1 Feeder is monitored and adjusted to ensure continuous and efficient feeding to machine
- 1.2 Carton blank pick-up and transportation system is monitored and adjusted to ensure accurate and continuous sheet handling and efficient operation
- 1.3 Transfer systems are monitored and adjusted to ensure correct and continuous carton blank handling and efficient operation
- 1.4 Substrate is added to process according to job specifications
- 1.5 Delivery is monitored and adjusted to ensure quality and efficient product delivery
2. Maintain complex carton folding and gluing process
- 2.1 Registration and accuracy of folds are monitored and adjusted to ensure product quality meets the approved sample standard
- 2.2 Gluing process is monitored and adjusted to ensure accuracy of glue application and strength of adhesion conforms to quality standards
3. Maintain operation of production process
- 3.1 Production process is operated in association with fellow workers and according to enterprise specifications and planned daily schedule
- 3.2 Production is maintained according to work health and safety requirements, manufacturer’s specifications and enterprise procedures
- 3.3 Performance is monitored and verified using the process control system according to enterprise procedures
- 3.4 Production difficulties are anticipated and preventive action is taken to prevent occurrence by timely intervention
- 3.5 Process adjustments to eliminate problems are reported according to enterprise procedures
- 3.6 Faulty performance of equipment is identified and reported according to enterprise procedures
- 3.7 Waste is sorted according to enterprise procedures
4. Identify and rectify problems
- 4.1 Problems in folding and gluing machine operation are identified and reported according to enterprise requirements
- 4.2 Adjustments or corrections are carried out according to specified procedures and consistent with operator’s skill level
- 4.3 Complex folding/gluing machine operation is checked to ensure correct operation
5. Conduct shutdown of production process
- 5.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures
- 5.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements
- 5.3 Waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures
- 5.4 Machine faults requiring repair are identified and reported to designated person, according to enterprise procedures
- 5.5 Repair/adjustment is verified prior to resumption of operations
6. Clean folding/gluing machine at end of run
- 6.1 Folding unit is cleaned ready for next run
- 6.2 Gluing unit is disengaged and cleaned ready for next run
- 6.3 Transport and delivery systems are cleaned ready for next run
- 6.4 Production records or other documentation are accurately completed where required by enterprise procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D3049 | ICPCF3109C | Produce complex folded and glued cartons | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBP49 | ICPCBF3090 | Produce complex folded and glued cartons | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZL5 | ICP31315 | Certificate III in Print Manufacturing | Qualification |
| AWD5 | ICP30915 | Certificate III in Printing and Graphic Arts (Cartons and Corrugating) | Qualification |