Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply waterproofing remedial processes
Apply waterproofing remedial processes
Unit of competency
National Code
CPCCWP3004A
CPCCWP3004A
State Code
W9625
W9625
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
20/06/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to apply remedial waterproofing processes to external and below ground level wet areas, using injection epoxy, cement crystallisation or hydrostatic coating methods.It includes identification of the waterproofing system to be used, its preparation and its application.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Identify waterproofing system.
- 2.1. Area to be waterproofed is identified from a technical report or diagnosed damp fault area and inspected for defects and soundness in accordance with job and manufacturer specifications.
- 2.2. Area of structure for waterproofing surface application is inspected for defects and soundness in accordance with job and manufacturer specifications.
- 2.3. Appropriate remedial waterproofing systems and products are identified, analysed and selected in accordance with job and manufacturer specifications and with material safety data sheet (MSDS) directions.
- 2.4. Range of waterproofing materials is checked for product suitability, conformity to specification and compatibility with surface material, preparation and waterproofing installation technique.
- 2.5. Type of waterproofing material is identified in accordance with type of substrate, job specification, state of structure and job safety requirements with MSDS directions.
3. Prepare for waterproofing process.
- 3.1. Site to be repaired is confirmed to be in accordance with drawings, specifications and manufacturers' specification.
- 3.2. Construction/installation site is set out to specified location, structure and dimensions in accordance with drawings and specifications.
4. Apply waterproofing using injection.
- 4.1. Injection hole set-out spacings and depth are determined and measured in accordance with manufacturer recommendations.
- 4.2. Materials are prepared for injection method application in accordance with manufacturer recommendations.
- 4.3. Injection equipment is prepared and set up for injection process in accordance with manufacturer recommendations.
- 4.4. Injection system is tested and flushed in accordance with manufacturer specifications.
- 4.5. Damp course is made water resistant and capped using injection method in accordance with manufacturer recommendations and to specifications.
5. Apply waterproofing using hydrostatic barrier coatings.
- 5.1. Area to be repaired is located from job instructions, drawings and specifications.
- 5.2. Materials are prepared for remedial coating method application in accordance with manufacturer recommendations.
- 5.3. Application equipment is prepared and set up for application process in accordance with manufacturer recommendations.
- 5.4. Injection system is tested and flushed in accordance with manufacturer specifications.
- 5.5. System is connected to tubing caps and damp course is made water resistant and capped using injection method in accordance with manufacturer recommendations and to specifications.
6. Clean up
- 6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 6.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to remedial waterproofing processes
relevant Australian standards
safe work procedures relating to remedial waterproofing processes
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
angle grinders
chisels
electric drills and screwdrivers
hammers
impact drills
measuring tapes and rules
mixing equipment
pressure injection equipment, including:
cartridge applications
compressors
hoses
pumps
vacuum pumps
spirit levels
straight edges.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Remedial injection materials include:
cementitious products
epoxies
expanding polyurethane foam
polyurethane resin systems
silicon, silane and siloxane products
single and dual component resins.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Identification includes:
preparation of the waterproofing material
application to a structural substrate.
Defects that may be addressed using injection methods include:
cracks in concrete walls and floors
damp or wet areas occurring in structures.
Waterproofing surface applications include:
floor surfaces
roof surfaces
standard wet areas
wall surfaces.
Remedial waterproofing systems include:
barrier of silicon to stop rising damp
concrete crystallisation or by injection
concrete repair injection hydrostatic barrier coatings
membranes
saturants on an external wall (in case of flood).
Substrates include:
aerated autoclaved concrete materials:
Hebel
Thermolite
blockwork
brickwork
cement render
ferrous and non-ferrous piping
fibrous cement sheeting
pre-cast concrete
polyvinyl chloride (PVC)
reinforced in situ concrete
timber and timber-based products
wet area plasterboard.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to remedial waterproofing processes
relevant Australian standards
safe work procedures relating to remedial waterproofing processes
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
angle grinders
chisels
electric drills and screwdrivers
hammers
impact drills
measuring tapes and rules
mixing equipment
pressure injection equipment, including:
cartridge applications
compressors
hoses
pumps
vacuum pumps
spirit levels
straight edges.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Remedial injection materials include:
cementitious products
epoxies
expanding polyurethane foam
polyurethane resin systems
silicon, silane and siloxane products
single and dual component resins.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Identification includes:
preparation of the waterproofing material
application to a structural substrate.
Defects that may be addressed using injection methods include:
cracks in concrete walls and floors
damp or wet areas occurring in structures.
Waterproofing surface applications include:
floor surfaces
roof surfaces
standard wet areas
wall surfaces.
Remedial waterproofing systems include:
barrier of silicon to stop rising damp
concrete crystallisation or by injection
concrete repair injection hydrostatic barrier coatings
membranes
saturants on an external wall (in case of flood).
Substrates include:
aerated autoclaved concrete materials:
Hebel
Thermolite
blockwork
brickwork
cement render
ferrous and non-ferrous piping
fibrous cement sheeting
pre-cast concrete
polyvinyl chloride (PVC)
reinforced in situ concrete
timber and timber-based products
wet area plasterboard.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum:
repair a crack in a concrete basement wall or a suspended car park slab, identifying remedial waterproofing method to be used, determining the type of material to be used and the repair requirement (e.g. spacing of injection ports/packers if using an injection method), and testing the application
inject a chemical damp course into a solid 230 brick wall/party wall and a cavity brick wall, plugging each procedure with epoxy plug, ensuring:
correct identification of requirement and installation of the waterproofing
correct selection and use of appropriate processes, tools and equipment
completing all work to specification.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to remedial waterproofing processes
hand and power tools, plant and equipment appropriate to remedial waterproofing processes
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum:
repair a crack in a concrete basement wall or a suspended car park slab, identifying remedial waterproofing method to be used, determining the type of material to be used and the repair requirement (e.g. spacing of injection ports/packers if using an injection method), and testing the application
inject a chemical damp course into a solid 230 brick wall/party wall and a cavity brick wall, plugging each procedure with epoxy plug, ensuring:
correct identification of requirement and installation of the waterproofing
correct selection and use of appropriate processes, tools and equipment
completing all work to specification.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to remedial waterproofing processes
hand and power tools, plant and equipment appropriate to remedial waterproofing processes
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1936 | BCGWP3004B | Apply waterproofing remedial processes | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCN64 | CPCCWP3004 | Apply waterproofing remedial processes | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D403 | CPC31411 | Certificate III in Construction Waterproofing | Qualification |