Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply waterproofing remedial processes
Apply waterproofing remedial processes
Unit of competency
National Code
CPCCWP3004
CPCCWP3004
State Code
OCN64
OCN64
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
01/06/2021
Nominal Hours
32
Description
This unit specifies the skills and knowledge required to apply remedial waterproofing processes to wet areas, meeting all relevant requirements of Australian Standards, work health and safety (WHS) requirements, and Commonwealth and state or territory legislation.A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare to apply waterproofing remedial processes.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Select and use personal protective equipment (PPE) as required for each stage of the task.
- 1.3 Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.4 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5 Select tools and equipment, check for serviceability and report any faults.
2 Select waterproofing remedial process and techniques.
- 2.1 Inspect and analyse defect that requires application of waterproofing remedial processes.
- 2.2 Select techniques and materials for the waterproofing remedial process in accordance with manufacturers’ specifications.
3 Apply waterproofing remedial process and techniques.
- 3.1 Prepare materials for remedial process to manufacturers’ recommendations.
- 3.2 Prepare and set up application equipment.
- 3.3 Prepare substrate for application.
- 3.4 Apply remedial waterproofing process to manufacturers’ recommendations.
- 3.5 Perform tests to confirm effectiveness of repair.
4 Clean up.
- 4.1 Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
- 4.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ recommendations.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9625 | CPCCWP3004A | Apply waterproofing remedial processes | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGE0 | CPC31420 | Certificate III in Construction Waterproofing | Qualification |