Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Erect and dismantle formwork for footings and slabs on ground

Erect and dismantle formwork for footings and slabs on ground

Unit of competency
National Code
CPCCCA2003A
State Code
W9339
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/03/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040301 - Building Science And Technology
Original Release Date
20/06/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to erect and dismantle formwork to footings and slabs on ground, to establish levels and contain finished concrete. It includes forming basic slabs and forming rebates to slabs on ground and steps to strip footings.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information to undertake planning and preparation.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
2. Erect formwork.
  • 2.1. Design of footing and/or slab on ground is identified from job drawings and specifications, and is checked to be in accordance with legislation, regulations and codes of practice.
  • 2.2. Formwork is set out to requirements of drawings and specifications.
  • 2.3. Fixing and fasteners are selected consistent with construction requirements of the job.
  • 2.4. Formwork shutters and/or edge boxing are constructed and erected to site requirements and specifications.
  • 2.5. Formwork support is braced to job requirements and specifications.
  • 2.6. Block-outs and cast-in services are installed to specified locations.
  • 2.7. Release agents are applied to formwork face, where specified, to manufacturer specifications.
3. Strip formwork.
  • 3.1. Edge boxing and bracing/strutting support are removed sequentially and safely.
  • 3.2. Timber components are de-nailed, cleaned and stored or stacked safely for reuse or removal from site.
  • 3.3. Steel components are cleaned, oiled and stored or stacked to manufacturer's maintenance recommendations.
  • 3.4. Damaged formwork components are safely discarded after stripping.
4. Clean up.
  • 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to erecting and dismantling formwork for footings and slabs on ground
relevant Australian standards
safe work procedures related to erecting and dismantling formwork for footings and slabs on ground
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
air compressors and hoses
automatic levels
bevels
chisels
hammers
hand saws
laser levels
marking equipment
measuring tapes and rules
nail bags
nail guns
pinch bars
power drills and power saws
power leads
saw stools
shovels
spanners
spirit levels
squares (combination/tri)
steel squares
string lines.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
bolts and nuts
boxing, either timber, metal, masonry, fibre cement sheeting or reconstituted timber products
coach screws
metal brackets
nails and spikes
patented metal fasteners
steel tie rods.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Formwork:
includes prefabricated or in situ and is to be rigid to withstand the mass of wet concrete and actions imposed during placement
formwork construction must comply with specifications to height and level and includes timber, metal or prefabricated for both footings and slabs on ground.
Formwork shutters and edge boxing include:
an edge rebate.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
form up a slab on ground a minimum of 9 square metres, incorporating an edge rebate and internal corner to specifications
form up a step to a foundation excavation to specified masonry units.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1785 BCGCA2003B Erect and dismantle formwork for footings and slabs on ground Unit of competency
Replaced By
State Code National Code Title Type
OAP28 CPCCCA2003 Erect and dismantle formwork for footings and slabs on ground Unit of competency