Unit of competency Outline
Date retreived
22/07/2026 10:41 PM AWST
22/07/2026 10:41 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform stress and load tests on integrated platforms
Perform stress and load tests on integrated platforms
Unit of competency
National Code
ICASAS516A
ICASAS516A
State Code
D8102
D8102
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
06/10/2011
Field of Education
020113 - Networks And Communications
Original Release Date
06/10/2011
Nominal Hours
25
Description
This unit describes the performance outcomes, skills and knowledge required to plan and perform tests to ensure the ability of a system to cope with expected high levels of data volume.
Notes
Elements and Performance Criteria
1. Create test plan
- 1.1 Determine scope, objectives and specific tests in order to place load on the system, including expected results and performance impact
- 1.2 Determine and document standards for acceptance and compliance with client
- 1.3 Determine and document clear responsibilities and contact points with third-party suppliers for support
- 1.4 Identify testing resources and tools from a range of available sources
- 1.5 Identify and record base-system loads or level of activity against which the test will be measured
- 1.6 Identify processes or steps in test, including automated testing
- 1.7 Assemble test-plan documentation and distribute to appropriate person
2. Undertake test
- 2.1 Implement test plan according to test plan sequencing
- 2.2 Confirm that each technology component operates correctly within integrated platform
- 2.3 Confirm that integrated platform operates to project and industry standards
- 2.4 Undertake documentation of testing outcomes to meet project standards
- 2.5 Detect faults
3. Diagnose and resolve faults
- 3.1 Identify and document faults according to project plan
- 3.2 Diagnose faults and take corrective action
- 3.3 Manage problem-resolution processes according to project procedures
- 3.4 Enforce compliance standards with third-party suppliers, as skills required
4. Update documentation
- 4.1 Update appropriate project and system documentation to record and present test findings to development staff for their attention, if test is unsuccessful
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
System may include:
application service provider (ASP)
applications
databases
gateways
internet service provider (ISP)
operating system
servers.
Client may include:
external organisation
individual
internal department
internal employee.
Appropriate person may include:
authorised business representative
client
supervisor.
Component may include:
databases
networks
servers
software integration.
Project plan may include:
parties and their responsibilities
planning and preparation that begins in the design phase, and runs concurrently with design, code and implementation
project budget
project objectives
project scope
schedule.
System may include:
application service provider (ASP)
applications
databases
gateways
internet service provider (ISP)
operating system
servers.
Client may include:
external organisation
individual
internal department
internal employee.
Appropriate person may include:
authorised business representative
client
supervisor.
Component may include:
databases
networks
servers
software integration.
Project plan may include:
parties and their responsibilities
planning and preparation that begins in the design phase, and runs concurrently with design, code and implementation
project budget
project objectives
project scope
schedule.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
test the system's ability to cope with expected high levels of data volume while meeting the predetermined performance standards
identify problems and fault-resolution strategies that may occur during stress testing
ensure system operates in the manner expected under expected conditions
ensure supporting material, such as procedures and forms, is accurate and suitable for the purpose intended
determine that stated conditions reflect the upper limits expected by client
ensure there are no unacceptable reductions in service
ensure individual elements and the overall system provide the desired result or functionality
ensure documentation is available and accurate.
Context of and specific resources for assessment
Assessment must ensure access to:
business requirements
project documentation, including templates, standards, specifications and client user and technical manuals
business rules and expected loads
base tools
technical components of system, including software, hardware and network
staffing resources, including development, operations and client user representatives
system or application suitable for testing
appropriate learning and assessment support when required
modified equipment for people with special needs.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of candidate preparing for test, and recording and investigating discrepancies and corrections after test
verbal or written questioning of skills and knowledge for identifying acceptance criteria and developing test plans
evaluation of candidate’s documented record of test results and recommended solutions.
Guidance information for assessment
Holistic assessment with other units to the industry sector, workplace and job role is recommended, where appropriate.
Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.
Indigenous people and other people from a non-English speaking background may need additional support.
In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
test the system's ability to cope with expected high levels of data volume while meeting the predetermined performance standards
identify problems and fault-resolution strategies that may occur during stress testing
ensure system operates in the manner expected under expected conditions
ensure supporting material, such as procedures and forms, is accurate and suitable for the purpose intended
determine that stated conditions reflect the upper limits expected by client
ensure there are no unacceptable reductions in service
ensure individual elements and the overall system provide the desired result or functionality
ensure documentation is available and accurate.
Context of and specific resources for assessment
Assessment must ensure access to:
business requirements
project documentation, including templates, standards, specifications and client user and technical manuals
business rules and expected loads
base tools
technical components of system, including software, hardware and network
staffing resources, including development, operations and client user representatives
system or application suitable for testing
appropriate learning and assessment support when required
modified equipment for people with special needs.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of candidate preparing for test, and recording and investigating discrepancies and corrections after test
verbal or written questioning of skills and knowledge for identifying acceptance criteria and developing test plans
evaluation of candidate’s documented record of test results and recommended solutions.
Guidance information for assessment
Holistic assessment with other units to the industry sector, workplace and job role is recommended, where appropriate.
Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.
Indigenous people and other people from a non-English speaking background may need additional support.
In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D0239 | ICAT5084B | Perform stress and load testing on integrated platform | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AUW78 | ICTSAS516 | Perform stress and load tests on integrated platforms | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D562 | ICA40611 | Certificate IV in Information Technology Testing | Qualification |