Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up machine for complex carton folding and gluing

Set up machine for complex carton folding and gluing

Unit of competency
National Code
ICPCBF410
State Code
AUP08
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
26/03/2015
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030717 - Plant And Machine Operations
Original Release Date
16/09/2015
Nominal Hours
60
Description
This unit describes the skills and knowledge required to set up and adjust a machine for complex carton folding and gluing to maintain the production process.It applies to individuals who have limited responsibility for preparation of materials and equipment in accordance with job specifications and procedures, and ensuring quality of output. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for job
  • 1.1 Read and interpret job requirements from job documentation or production control system
  • 1.2 Set-up is planned and carried out correctly in minimum time with minimum wastage
2. Set up carton blank transportation system
  • 2.1 Feeder is set up and adjusted according to job specifications
  • 2.2 Carton blank pick-up and transportation system is set up and adjusted according to job specifications
  • 2.3 Transfer systems are set up and adjusted according to job specifications
3. Set up machine for complex carton folding/gluing
  • 3.1 Folding units are set up and adjusted according to job specifications
  • 3.2 Folding rollers/belts/rails are set up and adjusted according to job specifications
  • 3.3 Gluing system is set up and adjusted according to job specifications using glue wheel and/or multiple glue heads
4. Set up carton delivery system
  • 4.1 Delivery is set up and adjusted according to job specifications
  • 4.2 Substrate is removed from process according to job specifications
  • 4.3 Carton transfer and control system is set up and adjusted according to job specifications
5. Conduct sample run
  • 5.1 Material to be used for sample is organised correctly
  • 5.2 Machine is set up and operated according to work health and safety requirements, manufacturer’s specifications and enterprise procedures to produce a specified sample
  • 5.3 Sample is visually inspected and/or tested for accuracy of folds, fibre tear, opening force, and fluff and glue placement according to enterprise procedures
6. Readjust settings
  • 6.1 Results are interpreted to determine adjustment requirements
  • 6.2 Adjustments are carried out according to product and machine specifications
No information
No information
Replaces
State Code National Code Title Type
D3076 ICPCF410C Set up machine for complex carton folding and gluing Unit of competency
Replaced By
State Code National Code Title Type
OBP66 ICPCBF4100 Set up machine for complex carton folding and gluing Unit of competency