Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install instrumentation and control apparatus and associated equipment
Install instrumentation and control apparatus and associated equipment
Unit of competency
National Code
UEEIC0022
UEEIC0022
State Code
OCB08
OCB08
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to install instrumentation and control apparatus and associated equipment.It includes preparing and installing instrumentation and control apparatus and associated equipment, as well as completing and reporting installation activities.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, is required. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Identifyinstrumentation, control apparatus and associated equipment
- 1.1 WHS/OHS requirements and workplace procedures are identified and applied
- 1.2 Hazards are identified, risks are assessed and control measures implemented
- 1.3 Safety hazards not previously identified are reported on job safety assessment and advice on risk control measures are implemented
- 1.4 Installation of apparatus is prepared in consultation with relevant person/s and scheduled
- 1.5 Nature and location of work is determined from documentation and/or relevant person/s to determine scope of work
- 1.6 Location of instrumentation, control apparatus and associated equipment is planned within constraints of building structure, significants and regulations
- 1.7 Advice is sought from relevant person/s to ensure work is coordinated with others in accordance with workplace procedures
- 1.8 Materials needed for installation work are obtained in accordance with workplace procedures and checked against job requirements
- 1.9 Tools, equipment and testing devices needed for work are obtained in accordance with workplace procedures and checked for correct operation and safety
- 1.10 Preparatory work is checked by supervisor to ensure no damage has occurred and work complies with job requirements
2 Install instrumentation, control apparatus and associated equipment
- 2.1 WHS/OHS risk control measures and procedures for carrying out the work are followed
- 2.2 Need to test or measure live electrical components is determined in accordance with WHS/OHS regulatory requirements and workplace procedures
- 2.3 Circuits/machines/plant are checked and isolated in accordance with workplace procedures
- 2.4 Instrumentation, control apparatus and associated equipment are installed with sufficient excess to adjust and maintain terminations in accordance with technical standards, manufacturer specifications and job requirements
- 2.5 Wiring and tubing is terminated at instrumentation, control apparatus and associated equipment in accordance with manufacturer specifications, functional and regulatory requirements
- 2.6 Unplanned situations are discussed with relevant person/s and documented in accordance with workplace procedures
- 2.7 Unplanned situations are dealt with safely and with approval of authorised person/s in accordance with workplace procedures
- 2.8 Regular quality checks of installed apparatus are undertaken in accordance with workplace procedures
- 2.9 Apparatus installation is performed without waste of materials, damage to apparatus, circuits, surrounding environment or services using sustainable energy principles and practices
3 Complete and report installation activities
- 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
- 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3 Final checks are made to installed apparatus to ensure it meets job requirements
- 3.4 ‘As-installed’ apparatus and associated equipment are documented and relevant person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC625 | UEENEEI108A | Install instrumentation and control apparatus and associated equipment | Unit of competency |