Unit of competency Outline

Date retreived
22/07/2026 5:02 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Replace a hard floor finish

Replace a hard floor finish

Unit of competency
National Code
CPPCLO3003A
State Code
WC108
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/01/2012
State Implementation and Classification
Approved Date
19/06/2012
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2012
Nominal Hours
20
Description
This unit of competency specifies the outcomes required to replace a hard floor finish. The unit covers the processes involved in removing the old floor sealant and replacing it with a new protective coating. This process is commonly known within the industry as ‘strip and seal’.The unit requires the ability to assess the extent of the removal and replacement needed through understanding client requirements and applying organisational policies and procedures. Selecting the appropriate equipment, chemicals and methods is essential to performing the task safely and efficiently.
Notes
Elements and Performance Criteria
1 Assess area to be stripped and sealed.
  • 1.1 Area requiring strip and seal is assessed, work order is reviewed according to company requirements, and issues are clarified with appropriate persons.
  • 1.2 Hazards are identified and risks controlled in work site according to legislative, occupational health and safety (OHS)and company requirements.
  • 1.3 Type of sealant or finisher on hard floor is identified by observation according to work order and company requirements.
  • 1.4 Type and condition of surface sealant or finisher are identified by observation and testing according to work order and company requirements.
  • 1.5 Compatible sealant or finisher is selected to replace existing sealant according to work order and company requirements.
  • 1.6 Size and usage pattern of work site are determined to ensure safety of personnel and efficient use of equipment and chemicals.
  • 1.7 Extent of required strip and seal is assessed and replacement method is selected according to work order and company requirements.
  • 1.8 Timing and availability of work site for strip and seal are confirmed according to work order and company requirements.
  • 1.9 Pre-existing floor damage is identified and reported to appropriate persons according to company requirements.
2 Select equipment and chemicals.
  • 2.1 Personal protective equipment (PPE) is selected and used according to manufacturer specifications, and OHS and company requirements.
  • 2.2 Equipment and chemicals are selected for work order according to OHS and company requirements.
  • 2.3 Operational effectiveness of equipment is checked according to manufacturer specifications and company requirements.
  • 2.4 Equipment is adjusted to suit operator’s requirements according to manufacturer specifications and OHS requirements.
  • 2.5 Chemicals are prepared according to manufacturer specifications, and OHS and company requirements.
3 Prepare work site.
  • 3.1 Hazards in work site are confirmed and risks are controlled and reassessed according to legislative, OHS and company requirements.
  • 3.2 Furniture and fittings that impede cleaning operation are removed according to work order, and OHS and company requirements.
  • 3.3 Signage and barriers are installed as required during cleaning operation according to work order, and OHS and company requirements.
  • 3.4 Floor surface is cleaned to remove soil according to company requirements.
  • 3.5 Work restrictions affecting completion of work order are identified and appropriate persons are promptly notified.
4 Remove and replace hard floor surface.
  • 4.1 Equipment and chemicals are used to strip existing sealant or finisher off hard floor according to work order, manufacturer specifications and company requirements.
  • 4.2 Equipment and chemicals are used to seal hard floor surface by applying sealant/finish according to work order, manufacturer specifications and company requirements.
  • 4.3 Work is performed according to work order, manufacturer specifications and legislative, OHS and company requirements.
5 Tidy work site.
  • 5.1 Collected soil and waste are disposed of according to client specifications, work order, manufacturer specifications and legislative, OHS, company and environmental requirements.
  • 5.2 Furniture and fittings are replaced according to client requests, work order and OHS requirements.
  • 5.3 Signage and barriers are removed according to work order, and OHS and company requirements.
6 Clean and safety check equipment, and store equipment and chemicals.
  • 6.1 Equipment and PPE are cleaned according to manufacturer specifications and environmental, OHS and company requirements.
  • 6.2 Equipment and PPE are safety checked according to manufacturer specifications and OHS requirements and required maintenance is recorded according to company requirements.
  • 6.3 Equipment and PPE are stored and maintained to allow ready access according to manufacturer specifications, and OHS and company requirements.
  • 6.4 Chemicals are stored according to manufacturer specifications, and OHS and company requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Strip and seal involve:
reducing existing sealant to solution using approved stripper
removing slurry of sealant and stripper from floor using manual or machine methods
applying approved sealant/finisher to hard floor surface using manual or machine methods.
Work order information may include:
access to work site, including:
access and egress points
timing of access
budget allocations
completion times and dates
human resource requirements to complete the work tasks
job requirements and tasks
legislative and local government requirements
OHS requirements and emergency response procedures
requirements for working in isolated and remote locations
resource requirements, such as equipment and materials
specific client requirements, such as:
dress and presentation requirements
relationships with other activities
use of signage and barriers
work schedules
work site contact persons
work site requirements for specific industries, such as:
hospitals and medical centres
nursing homes
retail food courts
schools
tourism and hospitality.
Company requirements may include:
business and performance plans
client communication procedures
client confidentiality procedures
client service standards
communication channels and reporting procedures
company goals, objectives, plans, systems and processes
company issued identification badges, cards or passes
company policies and procedures, including:
access and equity policy, principles and practice
OHS policies and procedures, including control procedures
maintenance procedures for equipment and PPE
those relating to own role, responsibility and delegation
work site access security clearance procedures
company service standards
defined resource parameters
dress and presentation requirements
duty of care, code of conduct, and code of ethics
emergency response and evacuation procedures
employer and employee rights and responsibilities
environmental protection procedures
personnel practices and guidelines
quality and continuous improvement processes and standards
records and information systems and processes
training materials (induction, refresher and new skills)
use of contractors.
Appropriate persons may include:
clients
colleagues
managers
persons in control of work sites
supervisors.
Hazards may include:
allergic reactions to chemicals or equipment, including latex allergies
biological and animal waste
bites and stings
blood and blood-stained products
confined or restricted spaces
contaminated clothing, materials or equipment
damaged or inappropriate equipment
dust and fibres
electrical hazards arising from:
cables
electrical fittings:
switches
lights
untested electrical equipment
fatigue
fire
gas
heights
inadequate lighting and ventilation
infectious and zoonotic diseases, such as:
Q fever
scabies
mobile equipment and vehicle hazards around plant and vehicles
moving or unguarded parts
noise
occupational violence and bullying
poor personal hygiene practices
spill, splash and spray
release of substances with negative environmental impact
synergistic chemical reactions, such as:
hazardous incompatibility
reactivity
syringes or other sharps
temperature extremes
ultraviolet light
unsafe manual-handling techniques, including awkward and repetitive postures
unsafe underfoot conditions, such as slippery, uneven and rough surfaces
work in unfamiliar isolated or remote environments.
Legislative requirements may include:
Australian standards, quality assurance and certification requirements
industry advisory standards and codes, such as:
building codes
dangerous goods codes
relevant commonwealth, state and territory legislation and local government regulations affecting company operation, including:
anti-discrimination and diversity policies
chemical controls
chemical registers and manifests
consumer protection
energy conservation
environmental protection
equal employment opportunity
freedom of information
industrial equipment certificates of competency or licences
industrial relations
OHS Acts and regulations
privacy
public health
trade practices
water conservation
workplace consultative arrangements.
Occupational health and safety (also known as workplace health and safety) requirements may relate to:
allergic reactions, such as contact dermatitis
communication devices for remote and isolated locations, such as:
mobile phone
two-way radio
dermatoxicological control and prevention measures
emergency procedures for eye and skin contact, and inhalation and ingestion of toxic substances
hazard identification and risk assessment mechanisms
health surveillance and monitoring, such as regular blood testing
hierarchy of hazard control procedures
maintaining clear access
national and industry standards and codes of practice
OHS control procedures, such as:
health and safety plans
job plans
job safety analyses
risk assessments
safe operating practices and procedures
safe system of work statements
safe work instructions
work method statements
reporting injury and dangerous occurrences
routes of entry and potential symptoms of exposure to chemicals
safe work practices for equipment, PPE and chemical storage, including interpretation of:
MSDS
hazardous substance information, such as long latency periods
safety training, induction and refresher training
selection and use of PPE and clothing appropriate to the hazard
ultraviolet light
up-to-date electrical test and tag compliance
use of chemicals according to MSDS
use of residual current devices
use, storage and maintenance of equipment according to manufacturer specifications and equipment operating manuals.
Sealant or finisher may include:
solvent-based wax finishes
water-based sealants, such as:
acrylic co-polymers
water-based urethanes.
Hard floors may include:
bricks
ceramic tiles
concrete
cork
marble
parquetry
pavers
polished wood
proprietary flooring encompassing new technologies
quarry tiles
rubber
slate
terrazzo
vinyl
wood.
Personnel may include:
client’s staff members
colleagues
general public
venue, facility, shopping centre staff and management.
Equipment may include:
abrasive pads
automatic scrubbers
bassine brushes
cleaning trolleys
cloths
dry vacuum cleaners
floor pads of various sizes for stripping old sealant and buffing
floor scrapers
floor squeegees
hand doodle bug holders
insta-lock pad holders
long-handled dustpans and brushes
low and high-speed buffers
microfibre products
mops (polycotton or cotton)
nylon pads
sealant applicators, such as:
fringe mops
lamb’s wool applicators
weighted acrylic covered applicators
wringer mops
scrubbers, usually mechanical
steel wool
wet vacuum cleaners.
Chemicals may include:
acid cleaners
alkaline cleaners
finishes
low environmental-impact chemicals
neutral cleaners
sealants
solvent cleaners
stripping agents.
Replacement methods may include:
light strip and seal
total strip and seal.
Personal protective equipment may include:
ear muffs and plugs
gloves, such as non-permeable
goggles
high-visibility vests and clothing
overalls and other protective clothing
respirators
safety glasses
safety shoes
splash-proof face masks
sun protection
tongs
ultraviolet protection
wet-work clothing.
Manufacturer specifications may include:
equipment operating manuals
instructional guides
MSDS
other resources supplied by the manufacturer, such as:
laminated cards
notices
wall posters
product labels
safety instructions pre-printed on equipment.
Signage and barriers may include:
physical barriers and restraints erected to restrict access to a site
signs complying with legislative requirements and Australian standards warning of danger or adverse conditions, including:
cleaning in progress
hazardous chemicals in use or present in work area.
Soil types can be wet or dry and include:
beverages
chemical
cigarette butts
dust
food
gravel
heavy dirt build-up
hospital waste
industrial
liquids
oil
paper
rainwater
stones
syringes
tar.
Work restrictions may include:
amount of cleaning anticipated
client activity
employee level of literacy and communication skills
faulty or inappropriate equipment
site accessibility
site hazards
skills of work unit or team
staffing resources
time limitations.
Waste may be either solid or liquid and include:
chemicals past expiry date
litter
obsolete equipment
packaging
sealer and stripper detritus
soil
used containers
used or contaminated PPE
used or unused chemicals.
Environmental requirements may include:
clean-up, containment and isolation
company policies and guidelines
emergency chemical spill control measures
environmental protection agency and requirements of government departments, such as:
agriculture
emergency services
hazardous materials handling
local government regulations and by-laws
low-energy cleaning methods
low environmental-impact chemicals
low-moisture cleaning methods
low water-use equipment and water-efficient cleaning methods
non-chemical cleaning methods.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by observing practical demonstrations of replacing a hard floor finish involving at least two different surfaces and two different work areas.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified in this unit.
In particular the person should demonstrate the ability to:
identify types of hard floor surfaces and sealants or finishers
comply with company and legislative requirements
use safe and efficient replacement methods
select cleaning equipment and chemicals, including sealants or finishers
achieve outcome in relation to customer work order and company requirements.
Context of and specific resources for assessment
Assessment of essential underpinning knowledge may be conducted in an off-site context. It is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include access to:
suitable work site or venue
suitable equipment and chemicals, including sealants or finishers
PPE
equipment operating manuals and MSDS
work order instructions, work plans and schedules, and policy documents
assessment instruments, including personal planner and assessment record book.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Property Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Guidance information for assessment
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
This unit could be assessed on its own or in combination with other units relevant to the job function, such as:
CPPCLO2001A Maintain hard floor surfaces
CPPCLO3002A Restore hard floor surfaces.
Replaces
State Code National Code Title Type
S4311 PRMCL03B Replace a hard floor finish Unit of competency
Replaced By
State Code National Code Title Type
S4311 PRMCL03B Replace a hard floor finish Unit of competency
AXG63 CPPCLO3002 Restore hard floor surfaces Unit of competency
State Code National Code Title Type
D767 CPP31011 Certificate III in Cleaning Operations Qualification
AZA4 HLT33215 Certificate III in Health Support Services Qualification