Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Diagnose and repair faults in wind turbine generator electrical systems

Diagnose and repair faults in wind turbine generator electrical systems

Unit of competency
National Code
UEPMNT447A
State Code
WG177
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
14/03/2013
State Implementation and Classification
Approved Date
17/04/2013
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
17/04/2013
Nominal Hours
54
Description
1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to diagnose and repair faults in large scale wind turbine generator (WTG) electrical systems.
Notes
Elements and Performance Criteria
1 Gather data
  • 1.1 Data logging information and error codes are accessed
  • 1.2 Sensory data on fault or problem (auditory, visual, smell, touch), is gathered
  • 1.3 Relevant hard copy or online documentation is accessed to support fault finding process
  • 1.4 Built-in fault indicators and error codes are, where appropriate, examined and correctly interpreted
  • 1.5 Reference to circuit diagrams, specifications, schematics and/or consultation with technical adviser is used are used to determine circuit/system function and characteristics
2 Interpret data to establish hypothesis in regards to WTG electrical system fault
  • 2.1 Knowledge of WTG electrical systems and performance parameters is applied to interpretation of fault data
  • 2.2 Faults are verified or localised using correct and appropriate techniques, procedures, tools and test equipment.
  • 2.3 Priorities are set for testing / replacement of specific components, wiring, and connections in the WTG
3 Repair WTG electrical system fault
  • 3.1 Risk analysis of the job is undertaken and communicated among the work team.
  • 3.2 Safety precautions such as circuit isolations, physical barriers, and other protective devices or systems are, where appropriate, used to ensure safety
  • 3.3 Tests are conducted to ensure fault has been correctly repaired or isolated
  • 3.4 Faulty components that have been removed from service are examined and where possible the cause of problem is identified
  • 3.5 Loose connections or wiring are repaired
  • 3.6 Parts likely to be cause of fault are removed and replaced with tested and operational parts
  • 3.7 System is tested to ensure correct operation
  • 3.8 Fault finding processes and work to repair complex fault(s) are, if required, effectively escalated with technical adviser.
4 Record WTG electrical system fault
  • 4.1 Faulty components and parts are correctly tagged, identified and stored or shipped as per enterprise requirements
  • 4.2 Faults are recorded to standard operating procedures.
  • 4.3 Cause of complex fault and process of repair is discussed with the team and other personnel using an appropriate forum.
RANGE STATEMENT
10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
Climbing equipment, including personnel lifts, climb assist, elevators, kadders
Lifting apparatus includes winches and cranes
Diagnose and rectification of faults in wind turbine generator electrical systems may include:
Power transformers and ring mains units (RMU)s as used for WTGs
Hydraulic equipment, including turbine braking equipment.
Diagnosis and repair may include: visual inspections, replacement of electrical components, replacement of electrical protection equipment, isolation diodes, uninterruptible power supplies (UPS, safety chain, DC systems, power factor correction equipment, lose wiring, checking the tension of bolts, replacing sensors, replacing slip rings, testing of equipment for correct operation
Tools may include spanners, screwdrivers, side cutters, pliers, wire strippers, RCD protection devices
Consumables include electrical tape, lugs and connectors
Test equipment may include multimeters, current tongs, micro-ohm meters, laptop computers, PC tablet, smart phones and other data acquisition tools and equipment.
Large Scale Wind Generators (WTGs) include systems having a rating of greater than 10 kW
Work completion details may include plant and maintenance records, job cards, check sheets, on device labelling updates and reporting and/or documenting equipment defects.
Work site environment may be affected by nearby plant or processes and climatic conditions e.g. wind speed, chemical, heat, dust, noise, height and oil.
Location of wind turbine generators may be in urban, suburban, regional or rural locales and environments.
Documentation may be either paper-based or electronic format.
Isolations can refer to electrical/mechanical or other associated processes.
Generic terms used throughout this Vocational Standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms that apply are given in the Glossaries, Section 2.1 of this Training Package.
EVIDENCE GUIDE
9) The Evidence Guide forms an integral part of this Unit and shall be used in conjunction with all components parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment
9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the industry-preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accordance with industry and regulatory policy.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Sources of evidence need to be ‘rich’ in nature to minimise error in judgment.
Activities associated with normal everyday work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines, Section 3.1 of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit
9.2)

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated:
On at least two (2) occasions, In accordance with the "Assessment Guidelines” for the UEP12 Training Package.
Evidence shall also comprise:
A representative body of work performance demonstrated within the timeframe typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and
Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and
Demonstrate an understanding of the required skills and knowledge as described in this unit to such an extent that the learner's performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and
Demonstrate an appropriate level of employability skills; and
Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and
Demonstrated performance across a representative range of contexts from the prescribed items below:

A
All of the following
Replace a battery cell in a DC battery bank
Repair an uninterruptible power supply (UPS) by replacing user-serviceable component/s

B
All of the following
Diagnose and replace an isolation diode
Repair a faulty ‘crowbar’ protection circuit
Replace a defective power factor correction capacitor

C
All of the following
Replace a defective LV circuit breaker
Perform a ‘cold’ start up sequence on the WTG

D
All of the following
Measure output current using current tongs
Measure HV, LV and ELV voltages through use of the appropriate test measurement tool
Perform wave analysis using an appropriate text measurement tool

E
All of the following
Confirm correct operation of grid isolation circuitry

F
All of the following
Repair damaged or faulty slip rings
Replace slip rings

G
All of the following
Replace a power transformer desiccant breather

H
All of the following
Deal with an unplanned event by drawing on essential knowledge and skills to provide appropriate solutions.

Context of and specific resources for assessment
9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.
These should be used in the formal learning/assessment environment.
Note:
Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy.
The resources used for assessment should reflect current industry practices in relation to:
Diagnose and repair faults in wind turbine generator electrical systems

Method of assessment
9.4)

This unit shall be assessed by methods given in the Assessment Guidelines, Section 1.3 of this Training Package.
Note:
Competent performance with inherent safe working practices is expected in the Industry to which this competency standard unit applies. This requires assessment in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units
9.5)

For optimisation of training and assessment effort, competency development in this unit may be arranged concurrently with units:

UEPMNT448A
Diagnose and repair faults in wind turbine generator control systems

UEPMNT449A
Diagnose and repair mechanical systems faults in wind turbine generators
Replaced By
State Code National Code Title Type
OAH54 UEPMNT447 Diagnose and repair faults in wind turbine generator electrical systems Unit of competency
State Code National Code Title Type
J529 UEP40612 Certificate IV in Large Scale Wind Generation - Electrical Qualification