Qualification Outline
22/07/2026 5:17 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate IV in Large Scale Wind Generation - Electrical
Certificate IV in Large Scale Wind Generation - Electrical
UEP40612
J529
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 2.00 | 07/09/2013 | Current | Approved |
Description
Scope
This qualification provides competencies to operate, test, fault find, alter, repair electrical equipment and systems associated with large scale wind power generation. It includes the requirements for an ‘Electrical Fitter licence’.
Schedule
Packaging Rules
The requirements for granting this qualification will be met when competency is demonstrated and achieved for:- Twenty one (21) core units
- A combination of elective units to achieve a total weighting of 380 points:
- A maximum of 60 weighting points may be chosen from Group A Imported and Common Elective Units
- A maximum of 120 weighting points may be chosen from Group B Elective Units.
- A minimum of 260 to a maximum of 380 weighting points may be chosen from Group C Elective Units.
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
Note:
1. Prerequisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.
1. Core Units
All twenty one (21) units must be completed.
2. Group A Imported and Common Elective Units
A maximum of 60 weighting points may be chosen from Group A.
Please refer to the Training Package for the full list of unit weighting points.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W7811 | UEENEEE009B | Comply with scheduled and preventative maintenance program processes | 18 | Unit of competency |
| W7740 | UEENEEC010B | Deliver a service to customers | 18 | Unit of competency |
| W7731 | UEENEEC001B | Maintain documentation | 18 | Unit of competency |
| WC385 | UEENEED101A | Use computer applications relevant to a workplace | 18 | Unit of competency |
3. Group B Elective Units
A maximum of 120 weighting points may be chosen from Group B.
Please refer to the Training Package for the full list of unit weighting points.
4. Group C Elective Units
A minimum of 260 to a maximum of 380 weighting points may be chosen from Group C.
Please refer to the Training Package for the full list of unit weighting points.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEB5 | UEP40618 | Certificate IV in Large Scale Wind Generation - Electrical | Qualification |
No information
Entry Requirements
Not applicable.