Qualification Outline
22/07/2026 4:24 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate IV in Large Scale Wind Generation - Electrical
Certificate IV in Large Scale Wind Generation - Electrical
UEP40618
BEB5
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 1.00 | 31/10/2018 | Current | Pending |
Description
Participants gaining this qualification will be able to operate, test, find and diagnose faults and alter and repair electrical equipment and systems associated with large scale wind power generation. It may also include the supervision of others and the coordination of work activities.
This qualification may meet the requirements for a Restricted Electricians Licence (Electrical Fitter). Licensing requirements should be confirmed with the relevant state/territory licensing and regulatory authorities.
No licensing, legislative or certification requirements apply to this qualification at the time of publication.
>>
Schedule
Packaging Rules
A total 1280 weighting points comprising 900 core weighting points, plus 380 elective weighting points from the general elective units listed below.- Choose a total of 380 weighting point from the general elective units list below of which between zero (0) and sixty (60) weighting points can be taken from Group A. A total of 120 weighting points can be selected from Group B. Between 260 and 380 weighting points may be taken from Group C, you may select all your elective units from this group.
- Up to sixty (60) weighting points of the general elective units Group A, may be selected, with appropriate contextualisation, from any relevant nationally endorsed Training Package or accredited course, provided that selected units contribute to the vocational outcome of the qualification. Previously assigned weighting points are listed in UEP CVIG, if not listed weighting points will be ten (10) points unless directed from the ESI Generation Industry Reference Committee (IRC). The general elective units must contribute to the vocational outcomes of the qualification.
Where imported units are selected, care must be taken to ensure that all prerequisite units specified are complied with.
Where a prerequisite unit is attached to a unit, it is identified by this symbol ∟.
1. Core Units
All twenty one (21) units, totaling 900 points, must be completed.
2. Group A Elective Units
A maximum of 60 weighting points may be chosen from Group A.
Please refer to TGA for a full list of unit weighting points.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W7811 | UEENEEE009B | Comply with scheduled and preventative maintenance program processes | 18 | Unit of competency |
| W7740 | UEENEEC010B | Deliver a service to customers | 18 | Unit of competency |
| W7731 | UEENEEC001B | Maintain documentation | 18 | Unit of competency |
| WC385 | UEENEED101A | Use computer applications relevant to a workplace | 18 | Unit of competency |
3. Group B Elective Units
A maximum of 120 weighting points may be chosen from Group B.
Please refer to TGA for a full list of unit weighting points.
4. Group C Elective Units
A minimum of 260 to a maximum of 380 weighting points may be chosen from Group C.
Please refer to TGA for a full list of unit weighting points.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| J529 | UEP40612 | Certificate IV in Large Scale Wind Generation - Electrical | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHQ4 | UEP40622 | Certificate IV in Wind Power Generation | Qualification |
No information
Entry Requirements
There are no entry requirements for this qualification.