Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Test and commission wind turbine generators
Test and commission wind turbine generators
Unit of competency
National Code
UEPMNT450
UEPMNT450
State Code
OAH51
OAH51
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
15/05/2019
Nominal Hours
54
Description
This unit involves the skills and knowledge required to conduct testing and commissioning of a wind turbine generator. Testing and commissioning of wind turbine generators includes the assessment and verification that all equipment and components are operating efficiently and are meeting operational requirements.Competency in this unit requires the ability to plan work, test systems equipment, test system and complete all work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan and prepare for work
- 1.1 Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
- 1.2 Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
- 1.3 Resources are obtained and inspected for compliance with job specification
- 1.4 Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
- 1.5 Correct materials and components for work are obtained and inspected for compliance with job specification
- 1.6 Commissioning is planned, sequenced and prioritised, in accordance with workplace procedures
- 1.7 Potential hazards are identified and risk control measures are implemented, in accordance with workplace procedures
- 1.8 Work area is accessed and prepared, in accordance with workplace procedures
2 Test systems equipment
- 2.1 Isolations are confirmed, where appropriate, in accordance with workplace procedures
- 2.2 Wind turbine generator system equipment is visually inspected to ensure absence of any damage, defects and deterioration, in accordance with workplace procedures and commissioning plan
- 2.3 Wind turbine generator system equipment is tested, in conjunction with other related systems and equipment, to ensure correct operation, in accordance with workplace procedures and commissioning plan
- 2.4 Wind turbine generator wiring systems are checked and tested, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan
3 Test system
- 3.1 Isolations are confirmed, where appropriate, in accordance with workplace procedures
- 3.2 Wind turbine generator system, plant and equipment are set up and calibrated, in accordance with workplace procedures, operational requirements and manufacturers' specifications
- 3.3 Wind turbine generator system is commissioned using appropriate plans, drawings and manuals, in accordance with workplace procedures and commissioning plan
- 3.4 Wind turbine generator system is commissioned, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan
- 3.5 Wind turbine generator equipment is commissioned, in accordance with workplace procedures and commissioning plan
- 3.6 Faulty wind turbine generator equipment is repaired or reported, in accordance with workplace procedures
- 3.7 Final inspection is carried out, in accordance with workplace procedures and commissioning plan
4 Complete work
- 4.1 Wind turbine generator commissioning is completed and appropriate personnel are notified, in accordance with workplace procedures
- 4.2 Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
- 4.3 Tools and equipment are maintained and stored, in accordance with workplace procedures
- 4.4 Work completion details are finalised, in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WG180 | UEPMNT450A | Test and commission wind turbine generators | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODZ34 | UEPMNT014 | Test and commission wind turbines | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEB5 | UEP40618 | Certificate IV in Large Scale Wind Generation - Electrical | Qualification |