Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain cabling for multiple access to telecommunication services

Install and maintain cabling for multiple access to telecommunication services

Unit of competency
National Code
UEENEEF102A
State Code
WC458
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
14/08/2013
State Implementation and Classification
Approved Date
28/07/2014
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
28/07/2014
Nominal Hours
108
Description
1)Scope:1.1) DescriptorThis unit covers the installation and maintenance of telecommunications cabling in buildings and premises. It encompasses working safely and to Australian Communications and Media Authority's ‘Open’ Cabling Provider Rule, installing multiple telephone line, multi-pair cables, backbone cabling, terminating in socket outlets, termination modules and distributors, testing and compliance checks and completing cabling documentation.
Notes
Elements and Performance Criteria
1 Prepare to install and maintain cabling.
  • 1.1 OHS procedures for a given work area are identified, obtained and understood through established routines and procedures.
  • 1.2 Health and safety risks are identified and established risk control measures and procedures are followed in preparation for the work.
  • 1.3 Remote power feeding is identified and established risk control measures prepared.
  • 1.4 The nature and location of the work is determined from documentation or in discussion with appropriate person(s) to establish the scope of work to be undertaken.
  • 1.5 Cable routes are planned within the constraints of the building structure, significants and regulations.
  • 1.6 Earthing requirements are determined with consideration of existing earthing arrangements, where applicable and of cable system earth upper and lower resistance limitations.
  • 1.7 Advice is sought from appropriate persons to ensure the work is coordinated effectively with others.
  • 1.8 Sources of materials that may be required for the work are established in accordance with established routines and procedures.
  • 1.9 Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
2 Install and maintain cabling.
  • 2.1 Established OHS risk control measures and procedures for carrying out the work are followed.
  • 2.2 Installed support structure is checked to ensure cable will not be exposed to damage during installation and general operation.
  • 2.3 Catenary supports are secured to building structure and tensioned where necessary to ensure cable weight can be carried in operating conditions with interference and safety segregation maintained including adherence to AS/ACIF S009.
  • 2.4 Protective earthing of metal work is installed in accordance with requirements and to industry standards.
  • 2.5 Cables/wires are handled in accordance with manufacturer's application specifications including tension and bending stress requirements.
  • 2.6 Sufficient excess is allowed at cable ends to facilitate termination.
  • 2.7 Telecommunication outlet ends of cable are uniquely labelled to match identifier at originating location.
  • 2.8 Cable is placed and secured to maintain safety and interference segregation in accordance with legislative and industry standards.
  • 2.9 Cable ties not tightened to the point of causing cable sheath damage or transmission impairment are trimmed flush to prevent risk of personal damage.
  • 2.10 Cables installed as catenaries or supported by catenaries in external environment shall meet minimum above ground clearances and clearances from hazardous electrical services as per AS/ACIF S009.
  • 2.11 Cables installed underground shall meet minimum depth of cover and segregation from hazardous electrical and other services as per AS/ACIF S009.
  • 2.12 Over-voltage protection devices are fitted to all cable pairs, where required, to suppress voltage surges with the devices protectively earthed in accordance with AS/ACIF S009.
  • 2.13 TRC/CES/Earth wire insulation is protected against damage and TRC/CES and protective earths segregated in accordance with relevant industry and legislative standards AS/ACIF S009.
  • 2.14 Procedures for referring non-routine events to immediate supervisor for directions are followed.
  • 2.15 Cabling is installed efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services.
  • 2.16 Routine quality checks are carried out to ensure cabling complies with requirements.
3. Terminate and test cables and earth wires.
  • 3.1 Established OHS risk control measures and procedures for carrying out the work are followed.
  • 3.2 Cable sheath removed to allow for correct termination length and without damage to underlying conductors and their insulation.
  • 3.3 Terminating modules are installed in accordance to manufacturer specifications and cable pairs neatly and sequentially fanned for termination.
  • 3.4 Conductors are terminated in accordance with recommended colour code sequence using appropriate termination tools in the manufacturer's specified manner.
  • 3.5 Cable shield (if applicable) is earthed to manufacturer specifications and relevant industry codes of practice including AS/ACIF S009.
  • 3.6 Visual inspection is undertaken to confirm termination colour code sequence has been followed prior to end-to-end testing of wire and pair termination integrity.
  • 3.7 Cable pairs are tested and clearly labelled to provide an accurate identification in accordance with requirements.
  • 3.8 TRC/CES/Earth wires are terminated with connectors recommended by manufacturers in accordance with relevant industry codes of practice including AS/ACIF S009.
  • 3.9 TRC/CES /Earth wire continuity is maintained through out and interface requirements with electrical systems are observed.
  • 3.10 TRC/CES /Earthing installation is tested for continuity, insulation resistance and conductive resistance as per relevant industry standards including AS/ACIF S009.
  • 3.11 Earthing system is labelled in accordance with requirements.
  • 3.12 Compatibility of alterations with existing systems is confirmed and new work tested both in isolation and when integrated with existing systems.
  • 3.13 Procedures for referring non-routine events to immediate supervisor for directions are followed.
  • 3.14 Cabling is terminated efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services.
  • 3.15 Routine quality checks are carried out and a defect rectified to ensure cabling complies with requirements.
4 Complete cabling work, records and reporting.
  • 4.1 OHS work completion risk control measures and procedures are followed.
  • 4.2 Work site is cleaned and made safe in accordance with established procedures.
  • 4.3 Record sheets and plans of cable location, type and infrastructure are accurately created or updated and stored in accordance with customer requirements.
  • 4.4 Cable pair record books are created or updated to provide an accurate record of pair locations, inter-connections and usage in accordance with industry codes of practice and AS/ACIF S009.
  • 4.5 Cabling completion advice is documented and reported in accordance with requirements.
RANGE STATEMENT
10) This relates to the unit as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance.
This unit shall be demonstrated in relation to cable laying and connecting applicable to larger commercial and industry installations involving many lines, multi-pair cables, backbone cabling, multi-story buildings and more complicated termination modules and distributors.
Generic terms used throughout this Vocational Standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms that apply are given in Volume 2, Part 2.1.
EVIDENCE GUIDE
9) This provides essential advice for assessment of the unit and must be read in conjunction with the performance criteria and the range statement of the unit and the Training Package Assessment Guidelines.
The Evidence Guide forms an integral part of this unit. It must be used in conjunction with all parts of the unit and performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment
9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the industry-preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accordance with industry and regulatory policy.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Sources of evidence need to be ‘rich’ in nature to minimise error in judgment.
Activities associated with normal everyday work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit
9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the ‘Assessment Guidelines - UEE11’. Evidence shall also comprise:
A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices, including the use of risk control measures as specified in the performance criteria and range statement
Apply sustainable energy principles and practices as specified in the performance criteria and range statement
Demonstrate an understanding of the essential knowledge and associated skills as described in this unit. It may be required by some jurisdictions that RTOs provide a percentile graded result for the purpose of regulatory or licensing requirements.
Demonstrate an appropriate level of skills enabling employment
Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures
Demonstrated consistent performance across a representative range of contexts from the prescribed items below:
Lay and connect cables for multiple access to telecommunication services as described in 8) and including:

A
Terminating systems at both distributor and outlet locations and at least one 50 pair copper cable, with accurate completion of installation records, drawing alterations and compliance forms

B
Placing of cables on support structures and building faces for both internal and external locations

C
Securing cables correctly for above locations

D
Avoiding cable damage such as crushing, burning, kinking, sheath twist, cutting and nicking, bending radius

E
Reading and interpreting drawings related to cable layouts, outlet location, cable coding system and identifiers, distributor locations

F
Conducting and interpreting cable test results

G
Correctly interpreting and applying standards and regulations

H
Completing the required documentation

I
Dealing with unplanned events by drawing on essential knowledge and skills to provide appropriate solutions incorporated in a holistic assessment with the above listed items

Context of and specific resources for assessment
9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.
These should be used in the formal learning/assessment environment.
Note:
Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy.
The resources used for assessment should reflect current industry practices in relation to laying and connecting cables for multiple access to telecommunication services.

Method of assessment
9.4)

This unit shall be assessed by methods given in Volume 1, Part 3 ‘Assessment Guidelines’.
Note:
Competent performance with inherent safe working practices is expected in the Industry to which this competency standard unit applies. This requires assessment in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units
9.5)

For optimisation of training and assessment effort, competency development in this unit may be arranged concurrently with unit:

UEENEEE105A
Fix and secure electrotechnology equipment

UEENEEE107A
Use drawings, diagrams, schedules, standards, codes and specifications
Replaces
State Code National Code Title Type
W7866 UEENEEF002B Lay and connect cables for multiple access to telecommunication services Unit of competency
Replaced By
State Code National Code Title Type
OBX97 UEEDV0005 Install and maintain cabling for multiple access to telecommunication services Unit of competency
State Code National Code Title Type
A169 UEE61111 Advanced Diploma of Automated Systems Maintenance Engineering Qualification
A132 UEE40111 Certificate IV in Computer Systems Qualification
A166 UEE60411 Advanced Diploma of Computer Systems Engineering Qualification
A155 UEE50111 Diploma of Computer Systems Engineering Qualification
A117 UEE30211 Certificate III in Computer Systems Equipment Qualification
A118 UEE30311 Certificate III in Custom Electronics Installations Qualification
A119 UEE30411 Certificate III in Data and Voice Communications Qualification
A104 UEE20711 Certificate II in Data and Voice Communications Qualification
AC741 UEESS00048 Data Communications - ACMA 'Open' Cabling Provider Skill set
AC472 UEESS00050 Data Communications - Install Aerial Communication Cables Skill set
AC336 UEESS00051 Data Communications - Install and Modify Performance Data Communication Optical Fibre Cabling Skill set
AB672 UEESS00052 Data Communications - Install and Modify Performance Data Communication Structured Cabling Skill set
AC195 UEESS00053 Data Communications - Install Below Ground Communication Cables Skill set
A133 UEE40211 Certificate IV in Electrical - Data and Voice Communications Qualification
D642 UEE62211 Advanced Diploma of Electrical - Engineering Qualification
A139 UEE40811 Certificate IV in Electrical - Fire Protection Control Systems Qualification
A158 UEE50411 Diploma of Electrical Engineering Qualification
A152 UEE43011 Certificate IV in Electrical Equipment and Systems Qualification
A131 UEE33011 Certificate III in Electrical Fitting Qualification
A164 UEE53011 Diploma of Electrical Systems Engineering Qualification
A125 UEE30911 Certificate III in Electronics and Communications Qualification
A137 UEE40711 Certificate IV in Electronics and Communications Qualification
A165 UEE60211 Advanced Diploma of Electronics and Communications Engineering Qualification
A160 UEE50511 Diploma of Electronics and Communications Engineering Qualification
A138 UEE40611 Certificate IV in Electrotechnology - Systems Electrician Qualification
A123 UEE30811 Certificate III in Electrotechnology Electrician Qualification
A153 UEE43111 Certificate IV in Energy Efficiency and Assessment Qualification
A141 UEE41011 Certificate IV in Energy Management and Control Qualification
A172 UEE61711 Advanced Diploma of Engineering Technology - Electronics Qualification
A173 UEE61811 Advanced Diploma of Engineering Technology - Computer Systems Qualification
A175 UEE62111 Advanced Diploma of Engineering Technology - Electrical Qualification
BEB4 UEP40318 Certificate IV in ESI Generation Maintenance - Electrical Electronics Qualification
J261 UEP40512 Certificate IV in ESI Generation Maintenance - Electrical Electronics Qualification
A124 UEE31011 Certificate III in Fire Protection Control Qualification
A140 UEE40911 Certificate IV in Industrial Electronics and Control Qualification
J529 UEP40612 Certificate IV in Large Scale Wind Generation - Electrical Qualification
BEB5 UEP40618 Certificate IV in Large Scale Wind Generation - Electrical Qualification
A146 UEE41711 Certificate IV in Rail - Communications and Network Systems Qualification
A129 UEE31511 Certificate III in Rail - Communications and Networks Qualification
A128 UEE31411 Certificate III in Security Equipment Qualification
A145 UEE41511 Certificate IV in Video and Audio Systems Qualification