Unit of competency Outline

Date retreived
22/07/2026 7:58 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Identify services layout and connection methods to medium rise construction projects

Identify services layout and connection methods to medium rise construction projects

Unit of competency
National Code
CPCCBC5009A
State Code
W9296
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
12/08/2009
Field of Education
040303 - Building Construction Management
Original Release Date
12/08/2009
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to identify drawings, specifications and requirements for services in a range of medium rise and wide span commercial projects. It requires an ability to identify and evaluate differing methods and services in accordance with building regulations and standards.
Notes
Elements and Performance Criteria
1. Evaluate commonly used methods of water storage supply and layouts.
  • 1.1. Water supply, connection and layout are sketched for a residence connected to a town supply or a tank storage supply in accordance with relevant building regulations and standards.
  • 1.2. Use of pumps to maintain water levels in storage tanks is documented for single and two-stage pumping.
  • 1.3. Limitations of water storage tanks connected for multi-function and single function services are identified and addressed.
2. Evaluate methods of sewerage and drainage disposal and their layouts.
  • 2.1. Sewerage connection and layout are sketched in accordance with relevant building regulations and standards.
  • 2.2. Different stack types are assessed with reference to number of fixtures and building type.
  • 2.3. Fixture units are identified.
  • 2.4. Methods used to connect main drains to local authority sewers are assessed against relevant building standards.
  • 2.5. Disposal of sewerage from fixtures situated below the level of the local authority sewer is assessed in accordance with relevant building regulations and standards.
  • 2.6. Collection, treatment and disposal of prohibited discharges are monitored for non-domestic buildings.
3. Assess commonly used methods for mechanical ventilation and air distribution and their layout.
  • 3.1. Methods of mechanical ventilation and air distribution are identified and sketched.
  • 3.2. Mechanical ventilation and air distribution system design layout is appropriate to the building design and complementary to other services.
4. Evaluate the range of hot water systems.
  • 4.1. Operating principles of various types of hot water systems are evaluated.
  • 4.2. Suitable hot water system is selected according to accepted and agreed requirements and specifications.
5. Evaluate effective natural lighting for a range of situations.
  • 5.1. Methods of roof construction used for daylight transmission are identified and outlined in accordance with relevant building regulations and standards.
  • 5.2. Methods used in artificial lighting are compared for various service situations in accordance with relevant building regulations and standards.
6. Ensure fire protection standards are met.
  • 6.1. Authorities involved in plan perusal and site inspection for the various building classifications are identified.
  • 6.2. Requirements for sprinkler systems and fire hoses for the various building classifications are identified according to legal and regulatory standards.
  • 6.3. Fire detector and alarm systems and the application of fire doors are addressed according to legal and regulatory standards.
  • 6.4. Extinguishing agents and their applications are identified.
7. Outline the requirements for general electrical and electronic service installation.
  • 7.1. Electrical supply authorities and procedures for connection to site are identified and complied with.
  • 7.2. Electrical design and provision for services are implemented in accordance with regulations and Australian standards.
  • 7.3. Electronic cabling, type of service, categories of cabling, layout of equipment, safe guards, access for maintenance, repair and extensions are identified and outlined in accordance with regulations and Australian standards.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Water supply includes:
single and two-stage pumping for multi-function and single function
tank storage supply relative to the public water supply and reservoir heights
town supply.
Sewerage connection and layout include:
graded or vertical discharge pipes
inspection shafts and overflow relief gullies (ORGs)
local authority sewerage drainage system
septic or biochemical treatment unit.
Methods of mechanical ventilation include:
air conditioning applications
air distribution, including mechanical ventilation requirements for enclosed car parks
air filtration, including air filters, ducting and main filter types
mechanical ventilation.
Hot water system details include:
area to be serviced
energy sources available
height of installation
number of outlets
type of occupancy
type of system.
Lighting for varying situations includes:
emergency lighting
natural and artificial lighting.
Electronic cabling factors include:
access for maintenance, repair and extension
categories of cabling:
data
lift controls
power supplies
telecommunications
layout of equipment:
computers
telephones
safe guards
type of service.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by the effective performance and application of principles relating to service drawings, specifications and methods of determining requirements for services to a range of medium rise and wide span commercial constructions.
This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
comply with OHS and organisational quality procedures and processes within the context of this unit of competency
apply and interpret relevant documentation, codes and legislation relating to performance of service installations
accurately apply principles relating to performance of service installations
identify typical faults and problems and take necessary action taken to rectify
identify service installations and hazard categories according to Australian standards, Building Code of Australia (BCA) and job specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
documentation, including design brief drawings, specifications, codes, design concepts, construction schedules and other necessary supporting documents
research resources, including systems information and data
access to relevant legislation, regulations and codes of practice.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W5942 BCGBC5009A Identify services layout and connection methods to medium-rise construction projects Unit of competency
Replaced By
State Code National Code Title Type
OCN83 CPCCBC5009 Identify services layout and connection methods for Type B and C constructions Unit of competency