Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Carry out basic demolition

Carry out basic demolition

Unit of competency
National Code
CPCCCM2009A
State Code
W9378
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040301 - Building Science And Technology
Original Release Date
20/06/2014
Nominal Hours
16
Description
This unit of competency specifies the outcomes required to remove components from single storey buildings and structures using basic demolition techniques. It includes the preparation of the site for the demolition process and the removal of components.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning of basic demolition processes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment are selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  • 1.5. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
2. Prepare demolition site.
  • 2.1. Requirements of the site demolition plan are interpreted in accordance with workplace procedures and construction type.
  • 2.2. Property/dilapidation survey is completed to assess condition of work site and surrounds prior to work commencing and for preparation of work areas.
  • 2.3. Confirmation is obtained from supervisor/regulatory authorities that all existing services have been disconnected before commencing demolition tasks.
  • 2.4. Hazardous material is identified for separate handling in accordance with workplace requirements and instructions.
3. Remove components.
  • 3.1. Building components are removed in a directed sequence in accordance with site demolition plan, demolition method statement, standards and workplace procedures.
  • 3.2. Removed components are relocated to storage or disposal area in accordance with workplace requirements.
  • 3.3. Materials and building component parts are safely and effectively handled using selected material handling techniques.
  • 3.4. Materials and components identified for salvaging are handled, stored and stacked ready for transport in accordance with standard material handling practices and workplace procedures.
4. Clean up.
  • 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specifications.
  • 4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to the conduct of basic demolition processes
relevant Australian standards
safe work procedures related to the conduct of basic demolition processes
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Basic demolition processes include:
dismantling or demolishing and removing materials and component parts of a building using only hand tools and small plant and equipment.
Safety (OHS) is to be in accordance with legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including emergency shutdown and stopping of equipment, extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
overhead lines and cables
restricted access barriers
surrounding structures
traffic control
underground services and utilities
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
bars (crow and pinch), bolt cutters, sledge hammers, spanners and wrenches, chisels, hacksaws, handsaws, hammers and pliers
picks and mattocks
power drills and saws, pneumatic tools, concrete saws, angle grinders, compressors and electric testers
shovels, spades, brooms and wheelbarrows
signs and barricades
water hoses and attachments
scaffolds and elevated work platforms.
Environmental requirements include:
clean-up protection
noise and dust
sedimentation control
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Site demolition plan includes:
documentation of the demolition process
safe work practices.
Construction type includes:
brickwork, blockwork, brick veneer and concrete
timber framed and light steel framed structures.
Preparation of work areas include:
assessing conditions of work site and surrounds
communicating with those who may be affected by the demolition task
identifying hazardous materials
identifying positions of hoses and cables, clear of hazards
locating signage and barricades
providing site safety.
Services include:
electricity
gas
telephone and computer/communication
water.
Demolition tasks can be performed on:
existing structure being renovated or extended, which involves complete or partial removal of components
new construction site.
Building components include:
concrete/masonry areas, including:
edge strips
pads
paths
retaining walls and fences
slabs
external sections of buildings, including:
attached structures, carports and sheds
non-load bearing walls
patios and decks
fixtures and fittings
internal sections of buildings, including:
built-in components
ceilings
cladding
flooring
non-load bearing partition walling
wet area components.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, given a site demolition plan and instructions, remove the fixtures and fittings, ceiling, and external and internal non-load bearing walls; and clean up, disposing or salvaging materials, ensuring:
correct identification of requirement and conduct of demolition
confirmation that wall or structure is not load bearing
identification and correct response to services
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1821 BCGCM2009B Carry out basic demolition Unit of competency
Replaced By
State Code National Code Title Type
OCQ99 CPCCCM2009 Carry out basic demolition Unit of competency