Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct lifting operations

Conduct lifting operations

Unit of competency
National Code
RIIHAN203A
State Code
WB271
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2011
State Implementation and Classification
Approved Date
11/02/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
11/02/2010
Nominal Hours
30
Description
This unit covers the conduct of lifting operations in the resources and infrastructure industries. It includes planning for lifting, preparing for lifting and moving loads. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan for lifting
  • 1.1. Access, interpret and apply compliance documentation relevant to the work activity
  • 1.2. Obtain, interpret and clarify/confirm work requirements in the form of shift briefings, handover details or work orders before proceeding
  • 1.3. Develop a preliminary lifting plan taking account of essential information
  • 1.4. Check and confirm job feasibility and schedule with the load designer and other relevant persons
  • 1.5. Confirm hazards associated with the use of cranes and other load moving equipment and identify and check measures to eliminate or control these hazards with appropriate parties
  • 1.6. Finalise and confirm lifting plan, including the scheduling of required resources
2. Prepare for lifting
  • 2.1. Identify, select, inspect, assemble and certify lifting equipment, materials and tools required for the plan
  • 2.2. Label unserviceable equipment, materials and tools
3. Move loads
  • 3.1. Deduce and confirm appropriate safe working loads and centre of gravity using load charts and sling tags/charts prior to load moving
  • 3.2. Direct the movement of the load using standard signals for load moving
  • 3.3. Perform load moving in accordance with the plan
  • 3.4. Perform work safely
  • 3.5. Connect lifting gear to load
  • 3.6. Connect load to movement device using appropriate and certified equipment
  • 3.7. Ensure stability of the load by application of load movement procedure, temporary bracing and/or load support
  • 3.8. Follow appropriate specifications during the placement and securing of the load
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
management plans
manager's rules
OHS policy
code of practice
manufacturer's instructions
safe working or job procedures
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Shift briefings may include:
site plans and drawings
work specifications
basic working plans and material schedules
the confirmed mass and dimensions of loads
capacities and availability of load shifting equipment
Preliminary lifting plan may include:
confirmed details of lifting and slinging requirements
confirmed dimensions
site access and egress
suitability and availability of materials
tools and equipment
identification of potential hazards
probable control measures
identification of site coordination requirements
Lifting equipment, materials and tools may include:
slings
ropes
shackles and eye-bolts
motive power including:
overhead
vehicle loading cranes
non-slewing cranes
Signals for load moving are to include:
those that are communicated verbally and with hand signals, to Australian standards

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the conduct of lifting operations
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of lifting operations
working with others to undertake and complete lifting operations that meet all of the required outcomes
consistent timely completion of the conduct of lifting operations that safely, effectively and efficiently meet the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment should sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirements, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete lifting operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaces
State Code National Code Title Type
W2622 MNCG1033A Conduct lifting operations Unit of competency
Replaced By
State Code National Code Title Type
WH297 RIIHAN203D Conduct lifting operations Unit of competency