Unit of competency Outline

Date retreived
22/07/2026 8:53 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and remove a secondary fan

Install and remove a secondary fan

Unit of competency
National Code
RIIUMM305D
State Code
WH707
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030305 - Materials Engineering
Original Release Date
29/05/2014
Nominal Hours
20
Description
This unit describes a participant’s skills and knowledge required to install and remove a secondary fan in Metalliferous mining. This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for the installation/removal of secondary fan
  • 1.1. Access, interpret and apply installation of secondary fan documentation and ensure the work activity is compliant
  • 1.2. Obtain, interpret, clarify and confirm work instructions
  • 1.3. Select, and check for faults, equipment/tools for the activity
  • 1.4. Select and wear personal protective equipment appropriate for work activities
  • 1.5. Inspect and assess site conditions and determine if scaling is required and take action
  • 1.6. Perform equipment pre-start checks start-up procedures
  • 1.7. Identify, address and report potential risks and hazards
  • 1.8. Communicate with other equipment operators and personnel using approved communication methods
  • 1.9. Identify, address and report environmental issues
  • 1.10. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  • 1.11. Use approved dust suppression and extraction methods
  • 1.12. Ensure work area is well ventilated before entry
2. Install and maintain secondary fan
  • 2.1. Isolate and lock out ventilation devices
  • 2.2. Install and/or check secondary fan installation structure for soundness
  • 2.3. Install and secure secondary fan using approved methods
  • 2.4. Check secondary fan for correct operation in accordance with maintenance schedule and replace and/or adjust as required
3. Remove secondary fan
  • 3.1. Isolate and lock out ventilation devices
  • 3.2. Safely loosen and remove secondary fan
  • 3.3. Ensure the safety of personnel and associated equipment and services
  • 3.4. Seal any reticulation system openings and prevent entry of foreign material
4. Conduct post operational procedures
  • 4.1. Carry out routine maintenance on equipment
  • 4.2. Clean and store auxiliary services equipment
  • 4.3. Complete housekeeping requirements
  • 4.4. Process written and verbal recording and reporting requirements
No information
No information
Replaces
State Code National Code Title Type
WB313 RIIUMM305A Install and remove a secondary fan Unit of competency