Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Deliver concrete to site

Deliver concrete to site

Unit of competency
National Code
PMCOPS261B
State Code
W2670
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/01/2004
State Implementation and Classification
Approved Date
16/11/2005
Field of Education
030717 - Plant And Machine Operations
Original Release Date
16/11/2005
Nominal Hours
30
Description
This competency covers the efficient delivery of quality concrete to site by road using an agitator or similar.In a typical scenario an operator delivers premix concrete to a customer. The operator is able to determine the product requirements from the production schedule and specifications. The operator typically works independently with frequent contact with the base plant. This competency is NOT intended to be used for the delivery of concrete within a site using mobile equipment or overhead cranes. PMCSUP270A Move materials should be used in these circumstances.
Notes
Elements and Performance Criteria
1 Charge concrete to agitator.
  • 1.1 Check job requirements and charge right job to agitator
  • 1.2 Determine water requirements and add to mix
  • 1.3 Check any special batch requirements and take action required.
2 Deliver concrete.
  • 2.1 Check slump to procedures
  • 2.2 Deliver concrete within required time and without delay
  • 2.3 Position vehicle as required by safety needs and customer specifications
  • 2.4 Report breakdowns or lengthy delays en route
  • 2.5 Maintain product quality as per requirements and procedures.
3 Conform to site protocols.
  • 3.1 Check access to site with customer
  • 3.2 Assess site conditions and then drive off road in a manner suited to the conditions, load and site requirements
  • 3.3 Mix concrete on site as per quality requirements
  • 3.4 Discharge concrete as required by customer
  • 3.5 Clean agitator on site after negotiating this with customer
  • 3.6 Complete all records including addition of water.
4 Rectify routine problems.
  • 4.1 Identify the range of faults that can occur during the operation
  • 4.2 Determine and rectify fault causes in accordance with procedures/work instructions
  • 4.3 Identify and rectify equipment failure causes in accordance with procedures
  • 4.4 Make sure appropriate records and log books of equipment operations are maintained to meet procedures
  • 4.5 Identify non-routine problems and report to designated person.
5 Control hazards.
  • 5.1 Identify hazards from the job to be done
  • 5.2 Identify other hazards in the work area
  • 5.3 Assess the risks arising from those hazards
  • 5.4 Implement measures to control those risks in line with procedures.
Range of variables
Context
This competency unit includes:
determining and adding the correct amount of water taking into account required specification and moisture/water already in the mix
measurement of slump or similar tests
customer service and product knowledge
knowledge of relevant road rules and waste disposal requirements.
It does NOT include the driving of the truck (which is a prerequisite).
Typical problems include:
sites with poor access/unstable soil
transportation/site delays
site conflicts
disposal of agitator washings.
This competency includes the operation of all ancillary equipment and the operation of plant using PLCs where appropriate.
All operations are performed in accordance with standard procedures and work instructions.
Evidence guide
Assessment context and methods
Assessment for this unit of competency will be on an operating plant. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this competency unit (eg, those parts of element 3 referring to dealing with customers). Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
Critical aspects
Competence must be demonstrated in the ability to recognise situations requiring action and then in implementing appropriate corrective action. Consistent performance should be demonstrated. In particular look to see that:
concrete is delivered in full, on time and in specification
there are good relations with the customers
there is good liaison with the batching plant.
These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus, with a walk-through forming part of the response. The assessment activities should include responding to a range of problems.
Resource implications
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Other assessment advice
This unit may be assessed in conjunction with:
PMCSUP280A Manage conflict at work
PMCSUP281A Deliver customer service.
Individual enterprises may choose to add prerequisites and corequisites relevant to their processes.
Essential knowledge
Knowledge and understanding of the equipment sufficient to recognise problems and the appropriate action to be taken.
Knowledge of the enterprise's procedures and relevant regulatory requirements along with the ability to implement them within appropriate time constraints and in a manner relevant to the operation of the equipment.
Competence includes the ability to:
apply and/or describe:
relationship between mixing time/water cement ratio and product quality
importance of slump
quality procedures
handling techniques to maintain quality

communicate with customers
determine, and meet customer requirements
as is relevant to the practical operation of the equipment.
Key competencies
1
2
3
4
5
6
7
Collect, analyse&organise information
Communicate ideas and information
Plan and organise activities
Work with others&in teams
Use mathematical ideas and techniques
Solve problems
Use technology
2
1
X
1
1
1
1
Replaced By
State Code National Code Title Type
WA946 PMC552061C Deliver concrete to site Unit of competency
State Code National Code Title Type
W191 PMC20104 Certificate II in Manufactured Mineral Products Qualification