Unit of competency Outline
Date retreived
23/07/2026 6:58 AM AWST
23/07/2026 6:58 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Solve problems in multiple path circuits
Solve problems in multiple path circuits
Unit of competency
National Code
UEECD0044
UEECD0044
State Code
OBY68
OBY68
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to solve problems in multiple path circuits.It includes working safely; applying problem-solving procedures, including the use of voltage, current and resistance measuring devices; and providing solutions derived from measurements and calculations to predictable problems in multiple path circuits.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to work on multiple path circuits
- 1.1 Scope of work to be undertaken is determined from relevant documentation, electrical drawings or relevant person/s
- 1.2 Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures for a given work area are identified and applied
- 1.3 Electrical hazards are identified, risks are assessed, and control measures are implemented
- 1.4 Advice is sought from the relevant person/s to ensure the work is coordinated effectively with others
- 1.5 Materials required for work are identified and accessed in accordance with workplace procedures
- 1.6 Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety
2 Solve multiple path circuit problems
- 2.1 The need to test or measure live is determined in accordance with WHS/OHS requirements and when necessary conducted in accordance with workplace procedures
- 2.2 Circuits are checked as isolated in accordance with workplace procedures and regulatory requirements
- 2.3 Expected circuit parameters are calculated from relevant component ratings/specifications
- 2.4 Circuit parameters are measured in accordance with industry standards and checked against expected values
- 2.5 Circuit problems are assessed using measured and calculated values as they apply to multiple path circuits
- 2.6 Circuit solutions are determined from measured and calculated values of resistance, voltage, current and power in extra-low voltage (ELV) multiple path circuits
- 2.7 Solutions are tested in accordance with workplace procedures and industry standards
- 2.8 Problems are resolved without damage to equipment, circuits, the surrounding environment or services using sustainable energy practices
- 2.9 Unplanned situations are responded to in accordance with workplace procedures, in a manner that minimises risk to personnel and equipment
3 Complete work and document problem-solving activities
- 3.1 WHS/OHS work completion risk control measures and procedures are followed
- 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3 Justification for solutions used to resolve circuit problems is documented
- 3.4 Work completion is documented, electrical drawings are updated, and relevant personnel are notified in accordance with workplace procedures