Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage installation and commissioning of equipment

Manage installation and commissioning of equipment

Unit of competency
National Code
FPICOT5203A
State Code
S4645
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
09/11/2010
State Implementation and Classification
Approved Date
02/06/2011
Field of Education
030701 - Mechanical Engineering
Original Release Date
02/06/2011
Nominal Hours
250
Description
Notes
Elements and Performance Criteria
No information
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below

OHS requirements are to be in accordance with Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures. Requirements may include:
the use of personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
elimination of hazardous materials and substances
manual handling including shifting, lifting and carrying

Legislative requirements are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care

Organisational requirements
may include legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)

Equipment
is to include all machinery and equipment available for production purposes and subsequent maintenance within the enterprise

Work plan
is to include the installation and commissioning sequence, use of equipment and labour requirements

Installation and commissioning
is to include the process of setting equipment to undertake the sequence of work and output required. Commissioning includes verification that the equipment is operating safely and to the intended purpose

Specifications
are to include size of equipment, capacity, output, power, maintenance requirements and safety details

Communication
may include schedules, verbal and non-verbal language, constructive feedback, active listening, questioning to clarify and confirm understanding, use of positive, confident and cooperative language, use of language and concepts appropriate to individual social and cultural differences, control of tone of voice and body language

Contract arrangements
may include installation, alignment and adjustment, operator training, testing and back up support

Testing
is to include operation in production mode to trial all aspects of the equipment to ensure accuracy and safety of the equipment

Schedule
may include work schedules for personnel, scheduling of processing work or scheduling of equipment down time

Trial run
see testing

Maintenance
is to include proactive and reactive approaches to maintenance and includes scheduled and emergency maintenance activities
is to include the shutting down of equipment, stripping equipment and checking, repairing or replacing parts or consumables

Records and reports
may include installation and commissioning outcomes, operating logs, performance records, quality outcomes, hazards, incidents or equipment malfunctions
may be manual, using a computer-based system or another appropriate organisational communication system

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently manage installation and commissioning of equipment according to organisational requirements

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice, including OHS, environmental and organisational policies and procedures, relevant to managing installation and commissioning of equipment
Comply with applicable licensing or certification requirements
Communicate effectively and work safely with others in the work area
Efficiently manage installation and commissioning of equipment within the enterprise

Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements

The following resources should be made available:

workplace location or simulated workplace
materials and equipment relevant to managing installation and commissioning of equipment
specifications and work instructions

Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI05 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies
Assessment methods must confirm the ability to access and correctly interpret and apply the essential underpinning knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role

The seven key competencies represent generic skills considered necessary for effective participation by an individual in the workplacePerformance Level 1 at this level, the candidate is required to undertake tasks effectivelyPerformance Level 2 at this level, the candidate is required to manage tasksPerformance Level 3 at this level, the candidate is required to use concepts for evaluating and reshaping tasks
Communicating ideas and information
By communicating in simple language to convey information and requests to colleagues, and report and record installation and commissioning outcomes (2)

Collecting analysing and organising information
By collecting, organising and analysing information required to manage the installation and commissioning of equipment (3)

Planning and organising activities
By organising work activities to ensure installation and commissioning of equipment occurs within designated timeframes (3)

Working with others and in teams
By using effective communication and interpersonal techniques with colleagues and others to maximise confidence, satisfaction and productivity during installation and commissioning processes (2)

Using mathematical ideas and techniques
By calculating time to complete tasks and estimating tools, equipment and material requirements including specifications, dimensions and settings (2)

Solving problems
By establishing safe and effective processes for managing installation and commissioning of equipment which anticipate likely problems to avoid wastage and downtime (3)

Using technology
By using computer equipment to assist in managing installation and commissioning of equipment (2)

Replaced By
State Code National Code Title Type
D5972 FPICOT5203B Manage installation and commissioning of equipment Unit of competency
State Code National Code Title Type
S674 FPI50310 Diploma of Timber Truss and Frame Manufacture Qualification