Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and control the field staff activities
Monitor and control the field staff activities
Unit of competency
National Code
UETTDRSO46
UETTDRSO46
State Code
OBG77
OBG77
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031301 - Electrical Engineering
Original Release Date
04/12/2019
Nominal Hours
135
Description
This unit covers the monitoring of permit to work requests, dispatching personnel, responding to alarms, travel and activity monitoring of field personnel, monitoring work activities of field personnel against work schedule. It also includes contingency skills, response to third-party enquiries, out of hour, response to man down alarm, tracking of field personnel (remote area), monitoring activities on system equipment, monitoring availability of assets (maintain a log), monitor equipment status, coordinating field activities, controlling and authorising field works, and preparing incident reports.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan for the monitoring and controlling of field activities
- 1.1 Work schedules, plans, requirements and established procedures are detailed and analysed and, if necessary, the extent of the preparation of the work determined for planning and coordination
- 1.2 Shift handover detail is received, understood and confirmed according to established procedures
- 1.3 Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures
- 1.4 Risk control measures for identified hazards are prioritised, implemented and evaluated against the work schedule
- 1.5 Salient system constraints are communicated to relevant persons and identified for worksites in accordance with established procedures
- 1.6 Operational and commercial requirements are communicated to stakeholders in accordance with established procedures
- 1.7 Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy policies and procedures related to the work are identified to ensure safe systems of work are followed
- 1.8 Relevant work permits are secured to coordinate the performance of work according to requirements and established procedures
- 1.9 Liaison and communication with authorised personnel, authorities, clients and land owners is performed/actioned and activities are coordinated to carry out work
2 Undertake monitoring and controlling of field activities
- 2.1 WHS/OHS policies and procedures and safe work practices are followed to eliminate or minimise incidents and hazards
- 2.2 Work is performed and coordinated in accordance with work schedules and established procedures
- 2.3 WHS/OHS risks are monitored and action taken according to established procedures
- 2.4 Remedial actions are taken to overcome any shortfalls encountered in the work schedule according to requirements and established procedures
- 2.5 Essential knowledge and associated skills are applied in an agreed timeframe and to quality standards efficiently according to requirements and established procedures
- 2.6 Solutions to non-routine problems are identified and actioned using essential knowledge and associated skills according to requirements
- 2.7 Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality outcome is achieved for the client/customer to community and industry standards
3 Complete monitoring and controlling of field activities
- 3.1 Work undertaken is checked against work schedule for conformance with requirements and anomalies are reported and solutions identified in accordance with established procedures
- 3.2 Relevant work permit(s) and field activities are signed off and the status of plant, equipment and personnel movements recorded and handover procedures are conducted in accordance with established procedures
- 3.3 Shift handover detail is relayed and confirmed according to established procedures
- 3.4 Work completion records, reports, documentation and information is confirmed, processed and appropriate personnel notified
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD763 | UETTDRSO46A | Monitor and control the field staff activities | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEF01 | UETDRSO018 | Dispatch and monitor field staff activities | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEW7 | UET60219 | Advanced Diploma of ESI - Power Systems | Qualification |
| BEW6 | UET50219 | Diploma of ESI - Power Systems | Qualification |
| BHA8 | UET60221 | Advanced Diploma of ESI - Power Systems | Qualification |
| BHB0 | UET50221 | Diploma of ESI - Power Systems | Qualification |
| BHA9 | UET50321 | Diploma of ESI - Power Systems Operations | Qualification |
| BEW1 | UET50319 | Diploma of ESI - Power Systems Operations | Qualification |
| BEV7 | UET60319 | Advanced Diploma of ESI - Power Systems Operations | Qualification |