Qualification Outline
22/07/2026 6:37 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Diploma of ESI - Power Systems Operations
Diploma of ESI - Power Systems Operations
UET50319
BEW1
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 2.00 | 20/04/2021 | Current | Approved |
| 1.00 | 25/09/2019 | Replaced | Approved |
Description
This qualification provides the skills and knowledge to work in the electricity supply industry (ESI) as a Power Systems Technical Officer, a High Voltage (HV) Substation Project Manager or a Senior Systems Operator.
This qualification covers designing new overhead and underground powerline systems, overseeing the construction of electrical substations and related projects. These roles may also manage personnel, the business aspects of projects and give specialist advice to deal with day-to-day issues and problems.
The skills and knowledge described within the units in this qualification may require a licence or permit to practice in the workplace.
Additional and/or other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing the qualification.
Schedule
Packaging Rules
A total of 1600 weighting points comprising:- 850 core weighting points listed below; plus
- 750 general elective weighting points from the general elective units listed below.
Choose a total of 750 weighting points elective units from the list below, of which between 0 and 270 weighting points can be taken from Group A; between 0 and 360 weighting points can be taken from Group B; between 0 and 200 weighting points can be taken from Group C and between 190 and 750 weighting points taken from Group D. You may select all your electives from this group.
Up to 270 weighting points of the general elective units Group A may be selected, with appropriate contextualisation, from any relevant nationally endorsed Training Package or accredited course, provided selected units contribute to the vocational outcome of the qualification. Previously assigned weighting points are listed in UET Transmission, Distribution and Rail Sector Training Package Companion Volume Implementation Guide, if not listed weighting points will be 10 points.
Where imported units are selected, care must be taken to ensure all prerequisite units specified are complied with.
1. Core Units
All core units must be completed.
2. Group A: Imported and Common Elective Units
Between 0 and 270 weighting points may be chosen from Group A.
Please refer to the packaging rules for the full details of available options.
3. Group B: Qualification Elective Units
Between 0 and 360 weighting points may be chosen from Group B.
Please refer to the packaging rules for the full details of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| S7308 | UEENEEE102A | Fabricate, assemble and dismantle utilities industry components | 36 | Unit of competency |
| WC532 | UEENEEH102A | Repairs basic electronic apparatus faults by replacement of components | 36 | Unit of competency |
| OBH47 | UETTDRIS67 | Solve problems in energy supply network equipment | 72 | Unit of competency |
| OBH46 | UETTDRIS68 | Solve problems in energy supply network protection equipment and systems | 36 | Unit of competency |
| S7315 | UEENEEG006A | Solve problems in single and three phase low voltage machines | 72 | Unit of competency |
| WC567 | UEENEEH139A | Troubleshoot basic amplifier circuits | 36 | Unit of competency |
| WC542 | UEENEEH112A | Troubleshoot digital sub-systems | 72 | Unit of competency |
4. Group C: Qualification Elective Units
Between 0 and 200 weighting points may be chosen from Group C.
Please refer to the packaging rules for the full details of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| WC671 | UEENEEI155A | Develop structured programs to control external devices | 36 | Unit of competency |
| OBI16 | UETTDRDS34 | Draft and layout a power system distribution substation minor upgrade | 54 | Unit of competency |
| OBI19 | UETTDRDS31 | Draft and layout a power system overhead distribution extension | 54 | Unit of competency |
| OBI17 | UETTDRDS33 | Draft and layout a power system street lighting system | 54 | Unit of competency |
| OBI18 | UETTDRDS32 | Draft and layout a power system underground distribution extension | 54 | Unit of competency |
5. Group D: Qualification Elective Units
Between 140 and 750 weighting points to be chosen from Group D.
Please refer to the packaging rules for the full details of available options.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| J530 | UET50312 | Diploma of ESI - Power Systems Operations | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHA9 | UET50321 | Diploma of ESI - Power Systems Operations | Qualification |
No information
Entry Requirements
There are no entry requirements for this qualification