Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop planned power systems outage strategies
Develop planned power systems outage strategies
Unit of competency
National Code
UETTDRDS46
UETTDRDS46
State Code
OBI05
OBI05
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
04/12/2019
Nominal Hours
126
Description
This unit covers the competency required to assess and manage the impact on the network and customers with regards to planned outages. This includes customer outage times, network and plant loading issues and regulatory requirements. A detailed knowledge of network performance indicators is required.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan for and coordinate the development of outage strategies
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence the outage strategies, are reviewed and determined
- 1.2 Purpose of the outage is established and expected outcomes of the work are confirmed with appropriate personnel
- 1.3 Organisational established procedures on policies and specifications for the outage are obtained or established with appropriate personnel
- 1.4 Equipment/tools and personnel protective equipment (PPE) are selected and coordinated based on specified requirements and established procedures
- 1.5 Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures
- 1.6 Risk control measures are identified, prioritised and evaluated against the work schedule
- 1.7 Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures
- 1.8 Resources, including personnel, equipment, tools and PPE, required for the job are identified, scheduled and coordinated and confirmed safe and in technical working order
- 1.9 Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work
- 1.10 Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised, where applicable, in accordance with established procedures
2 Carry out and coordinate the development of outage strategies
- 2.1 Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures
- 2.2 WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidence of accidents and minimise waste are incorporated into the strategy in accordance with requirements and/or established procedures
- 2.3 Strategy decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures
- 2.4 Mathematical models of the outage strategies are used to analyse the effectiveness of the finished project in accordance with requirements and established procedures
- 2.5 Technical advice is given to potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
- 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the strategy within an agreed timeframe according to requirements
- 2.7 Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements
- 2.8 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
3 Complete and coordinate the development of outage strategies
- 3.1 Final review of the strategy is undertaken to ensure it complies with all requirements and include all specifications and documentations needed to complete the project
- 3.2 Appropriate personnel are notified of completion and reports and/or completion documents are finalised
- 3.3 Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
- 3.4 Approved copies of outage strategy documents are issued and records are updated in accordance with established procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD636 | UETTDRDS46A | Develop planned power systems outage strategies | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODM80 | UETDRDS007 | Develop planned power systems outage strategies | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEW7 | UET60219 | Advanced Diploma of ESI - Power Systems | Qualification |
| BEW6 | UET50219 | Diploma of ESI - Power Systems | Qualification |
| BEW1 | UET50319 | Diploma of ESI - Power Systems Operations | Qualification |
| BEV7 | UET60319 | Advanced Diploma of ESI - Power Systems Operations | Qualification |