Unit of competency Outline

Date retreived
22/07/2026 8:02 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Implement traffic management plan in the transport industry

Implement traffic management plan in the transport industry

Unit of competency
National Code
TLIF4108A
State Code
WG228
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
21/04/2013
State Implementation and Classification
Approved Date
05/11/2014
Field of Education
061301 - Occupational Health And Safety
Original Release Date
05/11/2014
Nominal Hours
35
Description
This unit covers the competency required to implement a traffic management plans in the Transport Industry. It includes: planning and preparing; setting out, monitoring and closing down the traffic guidance scheme; and housekeeping.
Notes
Elements and Performance Criteria
1 Plan traffic guidance scheme
  • 1.1 Relevant compliance documentation is accessed and interpreted according to workplace procedures and regulatory requirements
  • 1.2 Work instructions relevant to the task are obtained and applied according to workplace procedures and regulatory requirements
  • 1.3 Safety requirements for the allotted tasks are obtained, confirmed and applied according to workplace policies and procedures and regulatory requirements
  • 1.4 Relevant signage and devices are identified, obtained and implemented according to the traffic management plan, workplace procedures and regulatory requirements
  • 1.5 Required tools and equipment are selected and inspected for serviceability according to workplace procedures and regulatory requirements
  • 1.6 Environmental protection requirements are identified and applied according to workplace procedures and regulatory requirements
  • 1.7 Legislative requirements for traffic controller’s assigned are checked and confirmed according to workplace procedures and regulatory requirements
  • 1.8 Site specific requirements for traffic flow are communicated appropriately in accordance with workplace procedures and regulatory requirements
  • 1.9 Work crew safety is appropriately considered within the Traffic Management Plan according to workplace procedures and regulatory requirements
2 Implement traffic guidance scheme
  • 2.1 Site specific traffic guidance scheme is selected according to workplace procedures and regulatory requirements
  • 2.2 Work schedule adherence requirements are determined, communicated and monitored according to workplace procedures and regulatory requirements
  • 2.3 Signage and device positioning is checked in accordance with the traffic management plan and according to workplace procedures and regulatory requirements
  • 2.4 Traffic plan is appropriately adjusted on site according to site specific conditions as appropriate to ensure Work Crew safety and in accordance with workplace procedures and regulatory requirements
3 Monitor traffic guidance scheme
  • 3.1 Traffic flow is monitored and effectiveness of traffic guidance scheme is measured according to workplace procedures and regulatory requirements
  • 3.2 Traffic guidance scheme adjustments are implemented according to workplace procedures and regulatory requirements
  • 3.3 Traffic controller performance management is undertaken according to workplace policies and procedures and regulatory requirements
  • 3.4 Offending motorists are dealt with according to workplace policies and procedures and regulatory requirements
4 Evaluate and audit the traffic guidance scheme
  • 4.1 Applied Traffic Plan is checked to ensure it matches the approved Traffic Plan in accordance with workplace procedures and regulatory requirements
  • 4.2 Traffic plan is checked to ensure suitability to the actual traffic conditions in accordance with workplace procedures and regulatory requirements
  • 4.3 The applied Traffic Plan is audited to ensure compliance with the approved safety plans in accordance with workplace procedures and regulatory requirements
5 Close down traffic guidance scheme
  • 5.1 Traffic control devices are removed in a safe and sequential manner, according to workplace policies and procedures and regulatory requirements
  • 5.2 Traffic guidance scheme information is accurately recorded according to workplace procedures and regulatory requirements
  • 5.3 Workplace incidents are accurately reported according to workplace procedures and regulatory requirements
6 Undertake housekeeping
  • 6.1 Work area is cleared in accordance with project environmental management plan and in accordance with workplace procedures and regulatory requirements
  • 6.2 Work tools and equipment is cleaned, checked, maintained and stored in accordance with manufacturer’s recommendations and workplace policies and procedures and regulatory requirements
  • 6.3 Traffic Management signs are returned to pre-work state in accordance with workplace procedures and regulatory requirements
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:

legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Codes of Practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Work instructions may be received via verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, charts and hand drawings, memos, maps, materials safety data sheets (MSDS) and diagrams or sketches and may include:
specifications
quality requirements
operational details
safe work procedures or equivalent
regulatory/legislative requirements
manufacturers' specifications and instructions
organisation work specifications and requirements
instructions issued by authorised organisational or external personnel
relevant Australian standards
Safety requirements may include:
those included in compliance documentation
personal protective equipment
safe operating procedures, including recognising and preventing hazards associated with:
uneven/unstable terrain
trees
pits
poles
trip hazards
dirt mounds
overhead services
underground services
bridges
surrounding buildings
obstructions
structures
facilities
fires
excavations
traffic
embankments
cuttings
hazardous materials
recently filled trenches
other machines
personnel
restricted access barriers
traffic control
working in proximity to others
worksite visitors and the public
safe parking practices, including:
ensuring access ways are clear
equipment/machinery is away from overhangs and refuelling sites
safe distance from excavations
secured from unauthorised access or movement
emergency procedures
Signage and devices are to include
temporary warning signs
regulatory and traffic cones
Signage and devices may include:
vehicle mounted signs and flashing lights
guide signs
warning signs
barriers
hazard markers
portable traffic signals
bollards
arrow boards
Tools and equipment are to include:
high visibility vests
cones
signage
notebooks
pens
radios
stop-slow bats
delineators
barricades
barriers
bollards
warning lights and beacons
arrow boards
signalling devices
Environmental aspects may include the requirements of the organisation/ project environmental management plan, and may include:
waste management
water quality protection
noise, vibration, dust management
clean-up management
Conditions may include:
varying terrain
all weather conditions
varying road surfaces
all vehicle types
rural, urban or residential localities
all times of day
varying traffic volumes
varying road types
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
tunnels
open roads
Communications is to include:
verbal instructions
fault reporting
Communications may include:
2-way radio
hand signals
mobile phone
site specific instructions
written instructions
instructions related to job/task
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for implementing of traffic management plans
implementation of requirements, procedures and techniques for the safe, effective and efficient implementing of traffic management plans, which are to include:
complying with State/Territory regulations on three separate live traffic projects, and
controlling site vehicles
working collaboratively with others to undertake and complete the traffic management plans that meet all of the required outcomes
consistent and timely implementation of traffic management plans that safely, effectively and efficiently meet the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
The environment of assessment and delivery should be sufficiently customised to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where appropriate, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
capacity to work with others to implement traffic management plans
Guidance information for assessment
Consult the TLISC for further information on assessment including access and equity issues.
Replaced By
State Code National Code Title Type
AWM09 TLIF4108 Implement traffic management plan in the transport industry Unit of competency
State Code National Code Title Type
J541 TLI42513 Certificate IV in Traffic Operations Qualification