Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Remove heritage leadlight and stained glass
Remove heritage leadlight and stained glass
Unit of competency
National Code
MSFSL5002
MSFSL5002
State Code
WI650
WI650
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040323 - Glazing
Original Release Date
20/06/2014
Nominal Hours
80
Description
This unit of competency covers removing heritage leadlight and stained glass panels in order to conserve them.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify panel removal requirements
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to heritage leadlight and stained glass operations are verified and complied with
- 1.2 Purpose of the removal is established confirmed and clarified with appropriate personnel
- 1.3 Removal outcomes are identified and confirmed
2 Plan removal processes
- 2.1 Location of the leadlight and stained glass panel to be removed is identified and observed
- 2.2 Removal sequence is identified and a work plan is developed
- 2.3 Tools and equipment required for the removal are identified
- 2.4 Approval of removal plan is obtained as required by agreed procedures
3 Prepare for removal
- 3.1 Tools and equipment are assembled, positioned and checked prior to use to ensure they are appropriate for the removal, serviceable and in a safe condition
- 3.2 Supporting frames and storage materials are prepared and positioned
- 3.3 Plans and other documents are assembled and positioned to allow for confirmation of the panel structure and placement
- 3.4 Photographs are taken of the panel for later reference
4 Remove the panel
- 4.1 Supporting frames are secured to the panel
- 4.2 Panel structural supports are removed and stored
- 4.3 Panel is removed and placed in the storage area or crated for transport
- 4.4 Any structural damage is identified and noted
5 Finalise and report on the removal
- 5.1 Removed panel is inspected
- 5.2 Tools and equipment are removed
- 5.3 Removal area is cleaned and rubbish disposed of
- 5.4 Removal report is prepared and provided
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAK07 | MSFDG5002 | Remove heritage leadlight and stained glass | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J751 | MSF50113 | Diploma of Stained Glass and Leadlighting | Qualification |