Unit of competency Outline

Date retreived
22/07/2026 11:57 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Inspect and prepare a motive power unit

Inspect and prepare a motive power unit

Unit of competency
National Code
TLIB3075
State Code
AVK49
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
22/11/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039999 - Engineering And Related Technologies, N.e.c.
Original Release Date
23/02/2016
Nominal Hours
197
Description
This unit involves the skills and knowledge required to inspect, prepare and start a motive power unit in accordance with relevant workplace procedures, rail safety regulations and codes of practice.It includes checking and preparing a motive power unit, visually examining a motive power unit, conducting in-cab checks, and starting and positioning a motive power unit for service in accordance with workplace requirements. A motive power unit is a rail vehicle used to provide the power to move itself or other vehicles.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed without supervision, generally within a team environment.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work activities
  • 1.1 Roster is checked and interpreted for day’s train driving activities
  • 1.2 Allocation of motive power units is checked, as required, by notices in conjunction with network control officer or roster
  • 1.3 Hazards are identified, risks are assessed and risk control measures are implemented
  • 1.4 Trackside safety and basic electrification awareness procedures are followed, as required, while locating allocated motive power unit in the yard
  • 1.5 Motive power unit inspection and preparation duties are identified and interpreted
  • 1.6 Train schedules, notices and other operational and regulatory documentation are accessed and interpreted in accordance with workplace procedures
  • 1.7 Communication equipment required for day’s operations is obtained and checked to ensure it is functional
  • 1.8 Required personal protective equipment (PPE) is obtained for use prior to day’s train driving activities
  • 1.9 Motive power unit to be inspected and prepared is located in the yard
2 Inspect and prepare motive power unit
  • 2.1 Features, functions and location of motive power unit and associated equipment are identified
  • 2.2 Logbook is checked to confirm serviceability of unit
  • 2.3 Preparation and safety checks are conducted in accordance with work health and safety (WHS)/occupational health and safety (OHS) and other workplace policies and procedures
  • 2.4 Motive power unit, kit and equipment are checked and defects and deficiencies are recorded and rectified, isolated, tagged or reported, as required, in accordance with workplace procedures and regulatory requirements
  • 2.5 Availability of appropriate fuel, lubricating oils, water, coolant and sand quantities are checked against journey requirements, as required, and appropriate action is taken to replenish them
  • 2.6 Relevant WHS/OHS and regulatory requirements are followed
3 Start motive power unit
  • 3.1 Motive power unit is started in accordance with manufacturer instructions and/or workplace procedures and operating faults are recognised, diagnosed, reported and recorded in appropriate records for follow-up
  • 3.2 Where critical or serious equipment faults cannot be readily rectified, motive power unit is shut down, faulty equipment is isolated and tagged, and problem is reported
  • 3.3 Instruments and gauges are observed and readings are interpreted to confirm effective operation
  • 3.4 Actions are taken to determine cause of identified problem in instruments and gauges, and situation is rectified or reported, as required
  • 3.5 Fluid levels are rechecked after starting and appropriate actions are taken, as required
  • 3.6 Pre-departure checks are carried out to ensure motive power unit is braking and powering effectively and is safe to move
4 Conduct in-cab checks
  • 4.1 Motive power unit is checked in correct sequence and all equipment is confirmed to be operating to optimum requirements
  • 4.2 Cab layout is checked and confirmed that it meets operating requirements
  • 4.3 Pre-departure mechanical checks are correctly performed and correct functioning of equipment confirmed in accordance with workplace procedures and manufacturer operating requirements
  • 4.4 Supervisory controls and indicators are checked to ensure they are functioning correctly and appropriate actions taken if not working correctly
  • 4.5 Communication equipment is checked to ensure it is functioning correctly and appropriate actions are taken if not working correctly
  • 4.6 Seat, windows, blinds, air conditioners, heaters and other personal in-cab equipment are checked and adjusted for correct functionality, safety and comfort
  • 4.7 Auxiliary equipment is checked and is confirmed to be operational in accordance with operating requirements
  • 4.8 Fire extinguisher and emergency toolbox are checked to confirm they are in position and meet operational requirements
5 Complete documentation
  • 5.1 Required documentation concerning inspection of motive power unit is completed and processed in accordance with workplace procedures and regulatory requirements
  • 5.2 Logbook and other service records on the motive power unit are completed and filed in accordance with workplace procedures and regulatory requirements
6 Position motive power unit
  • 6.1 Authority to move and position motive power unit is obtained and relevant personnel are advised of intention and procedures
  • 6.2 Motive power unit is operated in accordance with standard procedures and regulatory requirements, within operating and operational constraints
  • 6.3 Motive power unit is positioned in accordance with operational requirements and directions
  • 6.4 Motive power unit performance is monitored during operation to confirm effective operation or to identify defects
  • 6.5 Equipment defects are identified, reported, rectified and recorded or relevant personnel are advised for assistance
  • 6.6 Relevant WHS/OHS and regulatory requirements are followed to ensure safety and to prevent injury and damage
  • 6.7 Network control officer and other relevant personnel are advised that motive power unit is secured in the required position and is ready for service
No information
No information
Replaces
State Code National Code Title Type
D4992 TLIB3075A Inspect and prepare a motive power unit Unit of competency
State Code National Code Title Type
BHX8 TLI42622 Certificate IV in Train Driving Qualification
BHG7 TLI42621 Certificate IV in Train Driving Qualification
AWR7 TLI42615 Certificate IV in Train Driving Qualification