Unit of competency Outline

Date retreived
23/07/2026 7:27 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Remove and install large vehicle windscreens

Remove and install large vehicle windscreens

Unit of competency
National Code
AURVTG3013
State Code
WF482
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2013
State Implementation and Classification
Approved Date
17/07/2013
Field of Education
040323 - Glazing
Original Release Date
17/07/2013
Nominal Hours
30
Description
This unit covers the competence required to remove and install windscreens in "large" mining and agricultural vehicles.Licensing, legislative, regulatory or certification requirements may apply to this unit in some jurisdictions. Users are advised to check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1. Prepare for work
  • 1.1. Work instructions are used to determine job requirements, including method, materials and equipment.
  • 1.2. Job specifications are read and interpreted.
  • 1.3. WHS requirements, including personal protection and specific needs when working at heights, are observed throughout the work.
  • 1.4. Material for work is selected.
  • 1.5. Equipment and tooling are identified and checked for safe and effective operation.
  • 1.6. Procedures are determined to minimise waste material.
  • 1.7. Procedures are identified for maximising energy efficiency while completing the job.
2. Remove vehicle windscreen
  • 2.1. Information is accessed and interpreted from manufacturer/ component supplier specifications.
  • 2.2. Tooling and equipment for removal and screen support are selected and used.
  • 2.3. Work height safety harnesses/equipment and procedures are adopted.
  • 2.4. Removal is carried out in accordance with vehicle manufacturer/component supplier and tolerances.
  • 2.5. Removal is completed without causing damage to any component or system.
  • 2.6. Removal activities are carried out according to industry regulations/guidelines, WHS legislation, and enterprise procedures/policies.
  • 2.7. Workplace documentation is completed and dealt with relevant to removal outcomes.
3. Install vehicle windscreen
  • 3.1. Information is accessed and interpreted from manufacturer/ component supplier specifications.
  • 3.2. Type of glass for application is selected and used.
  • 3.3. Equipment for cutting windscreens from flat laminated glass is selected and used.
  • 3.4. Tooling and equipment for installation and screen support are selected and used.
  • 3.5. Work height safety harnesses/equipment and procedures are adopted.
  • 3.6. Installation is carried out in accordance with vehicle manufacturer/component supplier tolerances.
  • 3.7. Installation is completed without causing damage to any component or system.
  • 3.8. Drying times adhered to according to job requirements and manufacturer/component supplier specifications.
  • 3.9. Installation activities are carried out according to industry regulations/guidelines, WHS legislation, and enterprise procedures/policies.
  • 3.10. Workplace documentation is completed and dealt with relevant to installation outcomes.
4. Clean up work area and maintain equipment
  • 4.1. Material that can be reused is collected and stored.
  • 4.2. Waste and scrap is removed following workplace and environmental procedures.
  • 4.3. Equipment and work area are cleaned and inspected for serviceable condition in accordance with workplace procedures.
  • 4.4. Unserviceable equipment is tagged and faults identified in accordance with workplace requirements.
  • 4.5. Operator maintenance is completed in accordance with manufacturer/component supplier specifications and worksite procedures.
  • 4.6. Tooling is maintained in accordance with workplace procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Removal and installation methods
Removal and installation methods are to include frames, clamps, special rubber sections and glazed windscreen, cutting windscreens from flat laminated glass, and installing.
Installation
Installing may require/involve glass components, moulding/trims, mirrors, sun visors, aerials, electrical and mechanical components, rubbers, locking strips.
WHS
WHS requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, use of tooling and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, enterprise first aid, hazard control and hazardous materials and substances.
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation/regulation/codes of practice and workplace policies and practices.
Safe operating procedures
Safe operating procedures are to include, but are not limited to operational risk assessment and treatments associated with vehicular movement, toxic substances, electrical safety, machinery movement and operation, manual and mechanical lifting and shifting, working in proximity to others and worksite visitors.
Emergency procedures
Emergency procedures related to this unit are to include, but are not limited to emergency shutdown and stopping of equipment, extinguishing fires, enterprise first aid requirements and worksite evacuation.
Environmental requirements
Environmental requirements are to include but are not limited to waste management, noise, dust and clean-up management.
Quality requirements
Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures.
Statutory/regulatory authorities
Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice.
Tooling and equipment
Tooling and equipment may include hand tooling, power tooling, cleaning equipment, sealing equipment, lifting and supporting equipment, safety harnesses, scaffolds and cutting equipment.
Materials
Materials may include adhesives, solvents, installation consumables and cleaning materials.
Communications
Communications are to include, but are not limited to verbal and visual instructions and fault reporting and may include worksite specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers.
Information/documents
Sources of information/documents may include:
verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, memos, material safety data sheets, diagrams or sketches
safe work procedures related to removal and installation of windscreens
regulatory/legislative requirements pertaining to working with glass
engineer's design specifications and instructions
organisation work specifications and requirements
instructions issued by authorised enterprise or external persons
Australian Standards.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence is fully observed and there is ability to transfer competence to changing circumstances and to respond to unusual situations in the critical aspects of:
observing safety procedures and requirements
communicating effectively with others involved in or affected by the work
selecting methods and techniques appropriate to the circumstances
completing preparatory activity in a systematic manner
removing and installing a minimum of two different "large" vehicle windscreens
completing workplace records.
Context of, and specific resources for assessment
Application of competence is to be assessed in the workplace or simulated worksite.
Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with regulatory requirements, including Australian Standards.
The following resources should be made available:
workplace location or simulated workplace
materials relevant to removal and installation of windscreens
equipment, hand and power tooling appropriate to removal and installation of windscreens
activities covering mandatory task requirements
specifications and work instructions.
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package.
Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge.
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies.
Assessment may be applied under project related conditions and require evidence of process.
Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
It is preferable that assessment reflects a process rather than an event and occurs over a period of time to cover varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other persons subject to agreed authentication arrangements.
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role.
Guidance information for assessment
Replaces
State Code National Code Title Type
W5242 AURV334263A A Remove and install large vehicle windscreens Unit of competency
Replaced By
State Code National Code Title Type
AWZ96 AURVTG013 Remove and install large vehicle windscreens Unit of competency
State Code National Code Title Type
J410 AUR32212 Certificate III in Automotive Glazing Technology Qualification