Unit of competency Outline

Date retreived
23/07/2026 12:53 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design and size heated and cold water services and systems

Design and size heated and cold water services and systems

Unit of competency
National Code
CPCPWT4011A
State Code
D7508
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
27/09/2011
Field of Education
040327 - Plumbing
Original Release Date
27/09/2011
Nominal Hours
50
Description
This unit of competency specifies the outcomes required to design, size and document the layout of heated, tempered and cold water services, flushing systems, hydrant and hose reel systems for multi-floor buildings.It covers preparation for work, identification of water service and system requirements, planning the service and system layout and completion of work finalisation processes.
Notes
Elements and Performance Criteria
1. Prepare for planning.
  • 1.1. Nature and scope of planning task are identified and confirmed.
  • 1.2. Safety (OHS) requirements associated with planning, sizing and documenting the layout of heated, tempered and cold water services and systems, and workplace environmental requirements, are adhered to throughout the work.
  • 1.3. Work is organised and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
  • 1.4. Tools and equipment required for planning, sizing and documenting the layout of heated, tempered and cold water services and systems, including personal protective equipment, are selected and checked for serviceability.
  • 1.5. Work area in which planning process is to be conducted is prepared.
2. Identify system requirements.
  • 2.1. Information and specifications for required work are obtained and confirmed, if necessary by site inspection using relevant information.
  • 2.2. Regulations and Australian standards relevant to the work are consulted and applied to all aspects of the work.
  • 2.3. Quantity, location and type of take off points and fixtures are determined from plans and specifications.
  • 2.4. Heated, tempered and cold water services and systems are sized in accordance with relevant Australian standards and regulatory authorities' and workplace requirements.
3. Plan service and system layout.
  • 3.1. Layout of heated, tempered and cold water services and systems to point of discharge are planned in accordance with building plans, relevant Australian standards and workplace procedures.
  • 3.2. Materials required are specified and optimised in accordance with relevant Australian standards from the proposed design.
  • 3.3. Plans are recorded in accordance with regulatory authorities' and workplace requirements.
  • 3.4. Sustainability principles and concepts are applied to work preparation and application.
4. Restore work area.
  • 4.1. Work area is restored in accordance with workplace procedures.
  • 4.2. Tools and equipment used in the process are refurbished and left in accordance with workplace procedures.
  • 4.3. Documentation, including work backup, is completed in accordance with workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
W9767 CPCPWT4001A Plan, size and lay out hot and cold water services and systems Unit of competency
Replaced By
State Code National Code Title Type
WF975 CPCPWT4011B Design and size heated and cold water services and systems Unit of competency
No information