Unit of competency Outline

Date retreived
22/07/2026 6:00 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan, size and lay out hot and cold water services and systems

Plan, size and lay out hot and cold water services and systems

Unit of competency
National Code
CPCPWT4001A
State Code
W9767
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
21/07/2010
Field of Education
040327 - Plumbing
Original Release Date
21/07/2010
Nominal Hours
50
Description
Notes
Elements and Performance Criteria
No information
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
hazardous materials and substances
other machines
surrounding structure and facilities
trip hazards
underground services
use of tools and equipment
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.

clean-up protection
stormwater protection
waste management.

state or territory statutory authority
statutory plumbing authority.

computers running appropriate CAD software
drawing instruments
measuring equipment.

charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards, including AS/NZS3500 National plumbing and drainage set: Part 1.2 Water supply - Acceptable solutions
safe work procedures relating to planning, sizing and documenting the layout of hot and cold water services and systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.

drinkable water from a water meter, storage tank to a point of discharge and storage
fire hydrant and hose reel systems
hot/tempered water service to a point of discharge and storage
non-drinkable water from a source to a point of discharge and storage.

fixture
isolating valve.

building plans
specifications.

Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of:

locating, interpreting and applying relevant information, standards and specifications to the planning, sizing and layout of hot tempered and cold water services and systems
applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment

as a minimum, the ability to plan, size and document the layout of a water supply system for a building with a minimum of six floors (including a non-drinking supply); a flush valve system for a multi-floor complex, a minimum of 35 metres high; a hot/tempered water supply system for a building and a hydrant and hose reel system for a building with a minimum of six floors, ensuring:

correct identification of location, design and details of proposed services and systems
correct selection and use of appropriate processes, tools and equipment
completion of all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.

Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Integrated Framework Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Replaces
State Code National Code Title Type
W2617 BCPWT4001A Plan, size and layout hot and cold water services/systems Unit of competency
Replaced By
State Code National Code Title Type
D7508 CPCPWT4011A Design and size heated and cold water services and systems Unit of competency