Unit of competency Outline
Date retreived
23/07/2026 3:39 PM AWST
23/07/2026 3:39 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct an engineering survey
Conduct an engineering survey
Unit of competency
National Code
CPPSIS5018A
CPPSIS5018A
State Code
D1528
D1528
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/10/2008
Field of Education
031101 - Surveying
Original Release Date
28/10/2008
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to conduct an engineering survey on engineering and construction sites. It requires the ability to plan approaches to engineering contingencies and management requirements. Functions would be carried out within organisational guidelines.
Notes
Elements and Performance Criteria
1 Plan the task.
- 1.1 Objectives, principal work activities and constraints are defined and documented with written survey specifications.1.2 Details of instruments and basic techniques to be used are evaluated and determined.1.3 Design is interpreted to identify surveying data.1.4 Pertinent legal and statutory standards and requirements, and OHS standards are considered and adhered to.1.5 Skills and knowledge are updated to accommodate changes in engineering surveys.
2Execute the task.
- 2.1 Work is scheduled to be completed within time available.2.2 Project management mechanisms are implemented to measure, record and report progress of activities in relation to the agreed schedule and plans.2.3 Identified survey components are measured.2.4 Measured survey data is reduced to the project reference system for comparison with design.2.5 Impact of contingencies and problems are managed.2.6 Measurements are validated and recorded according to specifications.2.7 Checks are completed according to organisational guidelines.2.8 Equipment is checked to be in good working order.2.9 Manufacturer specifications with regard to the use of equipment are complied with.2.10 Processes are followed that comply with relevant legislation and company policy.
3Finalise the task.
- 3.1 Relevant personnel are informed of the results according to organisational guidelines.3.2 Required documentation is completed according to organisational guidelines.3.3 Survey data is archived according to project specifications.
4Review the task.
- 4.1 Review of achievements against objectives is undertaken.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE803 | CPPSIS5048A | Conduct an engineering survey | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D227 | CPP50107 | Diploma of Surveying | Qualification |