Unit of competency Outline

Date retreived
22/07/2026 11:24 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct an engineering survey

Conduct an engineering survey

Unit of competency
National Code
CPPSIS5048A
State Code
WE803
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
27/11/2012
State Implementation and Classification
Approved Date
27/02/2013
Field of Education
031101 - Surveying
Original Release Date
27/02/2013
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to conduct an engineering survey on engineering and construction sites. It requires the ability to plan approaches to engineering contingencies and management requirements. Functions would be carried out within organisational guidelines.
Notes
Elements and Performance Criteria
1 Plan the task.
  • 1.1 Objectives, principal work activities and constraints are defined and documented with written survey specifications.
  • 1.2 Details of instruments and basic techniques to be used are evaluated and determined.
  • 1.3 Design is interpreted to identify surveying data.
  • 1.4 Pertinent legal and statutory standards and requirements, and OHS standards are considered and adhered to.
2 Execute the task.
  • 2.1 Work is scheduled to be completed within time available.
  • 2.2 Project management mechanisms are implemented to measure, record and report progress of activities in relation to the agreed schedule and plans.
  • 2.3 Identified survey components are measured.
  • 2.4 Measured survey data is reduced to the project reference system for comparison with design.
  • 2.5 Impact of contingencies and problems are managed.
  • 2.6 Measurements are validated and recorded according to specifications.
  • 2.7 Checks are completed according to organisational guidelines.
  • 2.8 Equipment is checked to be in good working order.
  • 2.9 Manufacturer specifications with regard to the use of equipment are complied with.
  • 2.10 Processes are followed that comply withrelevant legislation and company policy.
3 Finalise the task.
  • 3.1 Relevant personnel are informed of the results according to organisational guidelines.
  • 3.2 Required documentation is completed according to organisational guidelines.
  • 3.3 Survey data is archived according to project specifications.
4 Review the task.
  • 4.1 Review of achievements against objectives is undertaken.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Objectives may include:
agreed client requirements
written survey specifications.
Constraints may include:
coverage
datum
environmental factors
industry requirements
legal and statutory
financial
resource availability
time.
Techniques may include:
field procedures
office procedures.
Design may include:
digital information
hard copy plans
maps
written instructions.
Surveying data may include:
depth
dimension
direction
flow rates
position
slope.
Legal and statutory standards may include:
local government requirements
national standards
state statutes and regulations.
OHS may include:
Australian standards
development of site safety plan
identification of potential hazards
inspection of work sites
training staff in OHS requirements
use of personal protective clothing
use of safety equipment and signage.
Time available may involve estimates for time duration of project, including:
client instructions
consideration of contingencies
consideration of past project experiences
experience of project personnel
location of project
methods to be employed
resources and equipment to be used.
Project management mechanisms may include:
communicating with stakeholders
resolving disputes
monitoring and adjusting key milestones.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover
observation errors
obstructions to project plan
weather.
Measurements may include use of:
current meter
echo sounder
global navigation satellite system (GNSS)
level
remote sensing
tape
theodolite
tide gauge
total station.
Specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans with all information included.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
manuals
OHS policies and procedures
personnel practices and guidelines outlining teamwork, work roles and responsibilities
requirements for data processing.
Equipment may include:
GNSS
level
tape
total station.
Manufacturer specifications may include:
equipment specifications
operator manuals.
Legislation may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
quality assurance requirements.
Company policy may include:
internal and external communication guidelines
company OHS standards
customer service standards
company goals, such as mission statement
governance guidelines
guidelines on the use of equipment
operational manuals
operational plan
strategic plan.
Relevant personnel may include:
colleagues
registered surveyors
company personnel
staff or employee representatives
supervisors or line managers
suppliers
users.
Required documentation may include:
electronic or paper-based correspondence with client
field records
final report
records of conversation
survey plots
organisational work activity sheets.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS5049A Conduct an engineering surveying project, and CPPSIS5057A Carry out a precision survey.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
accessing and interpreting design information to identify the components to be measured and monitored
performing measurements
planning resources
managing contingencies
recording and reporting non-conformity aspects
knowledge of engineering survey processes.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, that may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of surveying and spatial information services requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Where assessment is for the purpose of recognition (recognition of current competencies [RCC] or recognition of prior learning [RPL]), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge.
Assessment processes will be appropriate to the language and literacy levels of the candidate and any cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
D1528 CPPSIS5018A Conduct an engineering survey Unit of competency
Replaced By
State Code National Code Title Type
AXG55 CPPSIS5048 Conduct engineering surveys Unit of competency
State Code National Code Title Type
AB714 CPPSS00026 Perform Applied Engineering Surveying Skill Set Skill set
J357 CPP50112 Diploma of Surveying Qualification