Unit of competency Outline
Date retreived
23/07/2026 12:28 AM AWST
23/07/2026 12:28 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform plant operational maintenance
Perform plant operational maintenance
Unit of competency
National Code
RIISAM208A
RIISAM208A
State Code
WB456
WB456
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
23/04/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
23/04/2010
Nominal Hours
50
Description
This unit covers the performing plant operational maintenance in the coal mining industry. It includes: identifying and preparing for maintenance; conducting planned routine maintenance, breakdown maintenance and temporary repairs; and finalising the maintenance activity.
Notes
Elements and Performance Criteria
1. Identify and prepare for maintenance
- 1.1. Access, interpret and apply compliance documentation relevant to performing plant operational maintenance
- 1.2. Obtain, interpret and clarify/confirm work requirements in the form of shift briefings, handover details or work orders before proceeding
- 1.3. Select, prepare for use and transport equipment, materials and tools required for maintenance to the worksite
- 1.4. Access and apply safety information and procedures throughout the operations
2. Conduct planned routine maintenance
- 2.1. Receive schedule for planned routine maintenance and coordinate resources to carry out maintenance
- 2.2. Carry out maintenance
- 2.3. Complete details of routine maintenance actions and record any follow-up action required
3. Conduct breakdown maintenance
- 3.1. Evaluate the extent of work required to fix the breakdown and put in place site procedures to minimise loss of production
- 3.2. Carry out breakdown maintenance
- 3.3. Record details of maintenance action completed and/or required
4. Conduct temporary repairs
- 4.1. Identify the location of the problem and prioritise the requirement to minimise loss of production
- 4.2. Assess the requirement for temporary repairs and identify and acquire resources
- 4.3. Carry out the repair
- 4.4. Record details of temporary repairs
5. Finalise the maintenance activity
- 5.1. Complete site restoration and housekeeping
- 5.2. Pass recommendations for changes and improvements to the maintenance processes and procedures to the appropriate person
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Planned routine maintenance procedures are those established and authorised for the site and may include:
screen inspections
pump adjustments
crusher adjustments
belt tracking and tensions
chute inspections
oil levels
roller changes
unbolting pipes and flanges
Breakdown maintenance may include:
any plant and equipment failure and electrical resets
Temporary repairs may include:
patching
bandaging
plugging
clipping
stitching
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Planned routine maintenance procedures are those established and authorised for the site and may include:
screen inspections
pump adjustments
crusher adjustments
belt tracking and tensions
chute inspections
oil levels
roller changes
unbolting pipes and flanges
Breakdown maintenance may include:
any plant and equipment failure and electrical resets
Temporary repairs may include:
patching
bandaging
plugging
clipping
stitching
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for performing plant operational maintenance
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of plant operational maintenance
working with others to undertake and complete plant operational maintenance that meets all of the required outcomes
consistent timely completion of plant operational maintenance that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete plant operational maintenance
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for performing plant operational maintenance
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of plant operational maintenance
working with others to undertake and complete plant operational maintenance that meets all of the required outcomes
consistent timely completion of plant operational maintenance that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete plant operational maintenance
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH658 | RIISAM208D | Perform plant operational maintenance | Unit of competency |