Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform intermediate rigging
Perform intermediate rigging
Unit of competency
National Code
CPCCRI3013A
CPCCRI3013A
State Code
D7400
D7400
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
20/06/2014
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to erect cranes and tilt-up panels using intermediate rigging techniques. It includes load distribution and calculation.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied for the scope of work to be performed.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
2. Select equipment.
- 2.1. Resources, materials and equipment are selected in accordance with load charts and inspected for compliance with job specifications.
- 2.2. Lifting equipment is inspected according to manufacturer specifications.
- 2.3. Lifting and load shifting equipment identified as inconsistent with manufacturer specifications is labelled, rejected and disposed of to prevent its use in any circumstance.
- 2.4. Elevated work platforms and other means of mechanical access systems are determined and selected where specified.
- 2.5. Fall arrest equipment, with ground level installation, is installed.
- 2.6. Personnel cartage systems are determined and selected.
3. Connect equipment.
- 3.1. Loads are slung to ensure encapsulation of the whole of load.
- 3.2. Part loads are slung to ensure full encapsulation of the part load.
- 3.3. Whole or part loads are slung to protect loads and secured to prevent uncontrolled movement.
- 3.4. Load steerage lines are attached and used to prevent unnecessary load movement.
4. Move and position loads.
- 4.1. Load lifting/shifting order is determined to minimise necessity of double lifts.
- 4.2. Lifting/shifting equipment is connected to the load.
- 4.3. Test lift/shift is performed to ensure lift suitability.
- 4.4. Load is safely moved to required destination and secured in position to client specifications or job requirements.
- 4.5. Standard communication signals are used to coordinate safe movement of the load.
5. Remove rigging equipment.
- 5.1. Lifting/shifting equipment and packing is dismantled, lowered and inspected for wear.
- 5.2. Logbook and site records are completed to company requirements.
6. Clean up.
- 6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 6.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
- 6.3. Work completion procedures are applied and relevant personnel notified that work is finished.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to performing intermediate rigging
relevant Australian standards
safe work procedures relating to performing intermediate rigging
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
planning and preparation includes work site inspection, equipment defect identification, assessment of conditions and hazards and determination of work requirements
calculations include load charts, fleet angles, diverter sheaves, lead loads, head loads, load angle factors, multiple fall, load share, load share distribution, pre-cast compliance charts and safe working loads
sling types include chain, flexible steel wire rope, and natural or synthetic fibre
load slinging methods are to include straight sling, adjustable sling, reeved sling and inclined sling
lifting techniques include single and dual lifts
lifting devices include shackles, turn buckles, jacks, chain winches, hand operated creeper winches, chain blocks, pulley blocks, come alongs, air winches, trolleys, eye bolts, include rigging screws, lifting lugs, lifting clutches and snatch blocks
load shifting equipment includes skates, hydraulic jacks, winches and rails
personnel cartage systems include man boxes and elevated work platforms
types of cranes include fixed cranes, tower cranes, hydraulic mobile cranes, lattice boom mobile cranes, slewing cranes, non-slewing cranes and gantry cranes.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
automatic levels plumbing and levelling equipment
drifts
hammers
podgers spanners
shifting spanners
sledge hammers
spirit levels
tape measures
wedges
wrenches
may include:
angle grinders
elevated work platforms
explosive power tools
laser levels
oxy-acetylene equipment
skids and pneumatic tools
water levelling equipment.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to performing intermediate rigging
relevant Australian standards
safe work procedures relating to performing intermediate rigging
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
planning and preparation includes work site inspection, equipment defect identification, assessment of conditions and hazards and determination of work requirements
calculations include load charts, fleet angles, diverter sheaves, lead loads, head loads, load angle factors, multiple fall, load share, load share distribution, pre-cast compliance charts and safe working loads
sling types include chain, flexible steel wire rope, and natural or synthetic fibre
load slinging methods are to include straight sling, adjustable sling, reeved sling and inclined sling
lifting techniques include single and dual lifts
lifting devices include shackles, turn buckles, jacks, chain winches, hand operated creeper winches, chain blocks, pulley blocks, come alongs, air winches, trolleys, eye bolts, include rigging screws, lifting lugs, lifting clutches and snatch blocks
load shifting equipment includes skates, hydraulic jacks, winches and rails
personnel cartage systems include man boxes and elevated work platforms
types of cranes include fixed cranes, tower cranes, hydraulic mobile cranes, lattice boom mobile cranes, slewing cranes, non-slewing cranes and gantry cranes.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
automatic levels plumbing and levelling equipment
drifts
hammers
podgers spanners
shifting spanners
sledge hammers
spirit levels
tape measures
wedges
wrenches
may include:
angle grinders
elevated work platforms
explosive power tools
laser levels
oxy-acetylene equipment
skids and pneumatic tools
water levelling equipment.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
erect and dismantle at least one lattice boom crane and fly with correct rigging and slinging techniques
erect a multi point pre-cast tilt-up slab of at least 10 tonne with correct rigging, slinging and de-rigging techniques, including determination of lifting points, temporary supports and permanent fixing points from drawings
apply both single and dual lifting techniques.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
erect and dismantle at least one lattice boom crane and fly with correct rigging and slinging techniques
erect a multi point pre-cast tilt-up slab of at least 10 tonne with correct rigging, slinging and de-rigging techniques, including determination of lifting points, temporary supports and permanent fixing points from drawings
apply both single and dual lifting techniques.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9486 | CPCCRI3003A | Perform intermediate rigging | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCN09 | CPCCRI3013 | Perform intermediate rigging | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J496 | CPC32912 | Certificate III in Construction Crane Operations | Qualification |
| D396 | CPC30711 | Certificate III in Rigging | Qualification |