Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare simple drawings of as laid gas mains and services
Prepare simple drawings of as laid gas mains and services
Unit of competency
National Code
UEGNSG229
UEGNSG229
State Code
OAE05
OAE05
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
04/01/2019
Field of Education
040327 - Plumbing
Original Release Date
04/01/2019
Nominal Hours
36
Description
This unit involves the skills and knowledge required to produce drawings for as laid, new and altered gas installations, mains and services. It includes preparing drawings of newly constructed or altered pipework that is required to be recorded for future locating.This unit does not include complex drafting skills.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan to prepare simple drawings of as laid gas mains and services
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
- 1.2 Types of drawings required and key features, symbols and abbreviations for each type of plan and drawing used in the gas industry are identified in accordance with the scope and standard of work being undertaken
- 1.3 Drawing requirements and needs are determined from work instructions and confirmed with relevant person/s in accordance with workplace procedures
- 1.4 Client issues in relation to the drawing requirements are clarified and resolved in accordance with workplace procedures
- 1.5 Equipment, tools and apparatus for producing drawings are identified, obtained and checked for correct operation prior to commencing work
2 Prepare drawings of as laid gas mains and services
- 2.1 Site inspection is conducted, as required, and factors that may impact on technical drawings, including orientation, altering landscapes, building structures or temporary land marks are identified
- 2.2 Starting point and cross reference points are established and measurements from the starting point, distances and off sets taken and recorded in accordance with job requirements and workplace procedures
- 2.3 As laid pipework is drawn to scale on graph paper using industry standard drawing conventions in accordance with relevant codes and technical industry standards
- 2.4 Fittings that effect the off-set or depth of the pipework, including elbows and tees, are indicated on the drawing as required
- 2.5 Additional fittings that need to be recorded in line with drawing specifications, including in-line valves and tapping tees, are indicated on the drawing, as required
- 2.6 All dimensions, including off-sets, distances, directions, pipe diameter, symbols and abbreviations are included on the drawing in accordance with job specifications and workplace procedures
- 2.7 Standard drawing conventions are used to correct original job drawing to show final as laid arrangement in accordance with workplace procedures
- 2.8 Quality and safety checks of work and testing of pipework is conducted in accordance with industry standards, work instructions and workplace procedures
3 Complete work and relevant documentation
- 3.1 Additional documentation is completed, including district plan number, network area, street name, pressure ratings, pipe size and type, date laid and additional comments, as required, in accordance with job requirements
- 3.2 Drawings are finalised and signed off/closed in accordance with workplace procedures
- 3.3 Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
- 3.4 Appropriate person/s are notified of work completion in accordance with workplace procedures
- 3.5 All drawings and forms are completed and submitted to appropriate person/s in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WJ030 | UEGNSG229A | Prepare simple drawings of as laid gas mains and services | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BIL5 | UEG30122 | Certificate III in Gas Supply Industry Operations | Qualification |
| BDY6 | UEG40118 | Certificate IV in Gas Supply Industry Operations | Qualification |
| BHJ3 | UEG40221 | Certificate IV in Gas Supply Industry Operations | Qualification |
| BGL2 | UEG30120 | Certificate III in Gas Supply Industry Operations | Qualification |
| BHJ2 | UEG30121 | Certificate III in Gas Supply Industry Operations | Qualification |
| BGX6 | UEG50120 | Diploma of Gas Supply Industry Operations | Qualification |
| BIL6 | UEG40222 | Certificate IV in Gas Supply Industry Operations | Qualification |
| BGK8 | UEG40220 | Certificate IV in Gas Supply Industry Operations | Qualification |
| BDY4 | UEG60118 | Advanced Diploma of Gas Supply Industry Operations | Qualification |
| BDY5 | UEG50118 | Diploma of Gas Supply Industry Operations | Qualification |
| BDY3 | UEG30118 | Certificate III in Gas Supply Industry Operations | Qualification |
| BGK2 | UEG60120 | Advanced Diploma of Gas Supply Industry Operations | Qualification |