Unit of competency Outline
Date retreived
23/07/2026 12:18 AM AWST
23/07/2026 12:18 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Paint panels
Paint panels
Unit of competency
National Code
FWPWPP3202
FWPWPP3202
State Code
AXJ38
AXJ38
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
040325 - Painting, Decorating And Sign Writing
Original Release Date
05/10/2016
Nominal Hours
10
Description
This unit of competency describes the outcomes required to paint panels with water, oil or solvent based paints using roller coating line, spray booth or curtain coating equipment to finish coat wood panel products.The unit applies to production operators and technicians who paint panels in a forest and wood products factory settingNo licensing, legislative, regulatory, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for painting
- 1.1 Review work order and where required check with appropriate personnel.
- 1.2 Select appropriate personal protective and other equipment and check for operational effectiveness.
- 1.3 Obtain type and quantity of panels for painting from storage.
- 1.4 Select panel painting process, feed rates and paints and plan in line with work order.
2. Paint panels
- 2.1 Use equipment in line with organisational safety procedures, manufacturer’s instructions and environmental protection practices.
- 2.2 Load paint products in equipment and apply paint to panel, monitoring and adjusting flow rates and viscosity continually.
- 2.3 Check paint operations regularly and clear blockages and filters to maintain paint coverage.
- 2.4 Check panels regularly for surface quality and contamination, and grade according to work order requirements.
- 2.5 Remove defective panels from painting process and review for disposal or re-painting.
- 2.6 Dry and stack material safely in designated location.
3. Shut down and clean equipment
- 3.1 Coordinate shutdown procedures with other line operators in line with organisational safety procedures.
- 3.2 Turn off pumps and flush equipment in line with manufacturer’s instructions.
- 3.3 Dispose of excess paint and flushing liquid in line with environmental protection practices.
- 3.4 Store equipment and paint in line with organisational procedures.
- 3.5 Record and report production outcomes and equipment faults to appropriate personnel.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D6117 | FPIWPP3202B | Paint panels | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAL3 | FWP30416 | Certificate III in Wood Panel Products | Qualification |