Unit of competency Outline
Date retreived
22/07/2026 9:07 PM AWST
22/07/2026 9:07 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install meters for non-potable, non-urban water supplies
Install meters for non-potable, non-urban water supplies
Unit of competency
National Code
NWP302A
NWP302A
State Code
D4810
D4810
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
11/04/2013
Field of Education
040327 - Plumbing
Original Release Date
11/04/2013
Nominal Hours
20
Description
This unit covers the competency required to install water meters for non-potable water allocation in non-urban water systems.
Notes
Elements and Performance Criteria
1Confirm conditions of the site for meter installation.
- 1.1 Identify the location of the site and establish client information.
- 1.2 Identify access to the site and any conditions of access.
- 1.3 Test the conditions of the site and analyse impact on installation assets.
- 1.4 Complete an environmental impact statement for the site.
- 1.5 Carry out a job safety analysis and identify hazards and control measures.
2Set out the site.
- 2.1 Locate and install temporary benchmark.
- 2.2 Store and secure material and equipment on site.
- 2.3 Calculate and mark the site perimeters in relation to the flow of the channel.
- 2.4 Ensure that excavations provide sufficient width for movements of installation.
3Install meter facilities.
- 3.1 Install sumps and headwalls to ensure correct elevation, orientation and horizontal and vertical levels.
- 3.2 Install pipes and meter pits to ensure the correct elevation, fall and orientation.
- 3.3 Check pipe fittings and seals and eliminate flow disturbance.
- 3.4 Install solar panels and display units according to manufacturers' requirements, check for operation and seal.
4Install meters.
- 4.1 Install meters in meter pits according to manufacturers' requirements.
- 4.2 Fit meters according to manufacturers' requirements.
- 4.3 Align flanges, gaskets and internal pipe walls to eliminated flow disturbance and leaks.
- 4.4 Locate and support meters to protect them from traffic and vibration.
5Restore site.
- 5.1 Backfill upstream and downstream sumps with suitable material, moisture content and compaction to maximize compaction efficiency.
- 5.2 Restore the site to closest to original site conditions.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Client information will include:
landowner details
GPS coordinates
identification of the supply channel
running distance from validated point on the channel
discharge point
Conditions of access will include:
suitability of existing access
landowner conditions
stock safety
vehicle and driver safety
Conditions of the site will include:
soil sampling and testing
water infiltration
compaction of backfill
suitability of source head for accuracy
power supply
communication links
Environmental impact statement will include:
water
air
soil
vegetation
fauna
cultural and heritage
Job safety analysis will include:
personal protective equipment
safe access
confined space requirements
safe use of machinery and equipment
level of risk of hazards
adjustments to control hazards
Movements of installation will include:
protect from collapse
correct depth
sufficient compaction
Client information will include:
landowner details
GPS coordinates
identification of the supply channel
running distance from validated point on the channel
discharge point
Conditions of access will include:
suitability of existing access
landowner conditions
stock safety
vehicle and driver safety
Conditions of the site will include:
soil sampling and testing
water infiltration
compaction of backfill
suitability of source head for accuracy
power supply
communication links
Environmental impact statement will include:
water
air
soil
vegetation
fauna
cultural and heritage
Job safety analysis will include:
personal protective equipment
safe access
confined space requirements
safe use of machinery and equipment
level of risk of hazards
adjustments to control hazards
Movements of installation will include:
protect from collapse
correct depth
sufficient compaction
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to install meters for non-potable, non-urban water supplies including:
identifying and analysing client requirements, site conditions and their impact on the types of meter required, and the design of the installation
identifying and analysing environmental conditions and limitations and the impact of work to be undertaken
identifying and analysing safety risks and hazards and responding to remove risks and hazards
preparing sites and equipment for installation
installing meter facilities using site specific requirements
installing meters according to client and manufacturers' requirements and conditions
identifying faults, changes and failure indicators
restoring sites to original conditions
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning or examination to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to install meters for non-potable, non-urban water supplies including:
identifying and analysing client requirements, site conditions and their impact on the types of meter required, and the design of the installation
identifying and analysing environmental conditions and limitations and the impact of work to be undertaken
identifying and analysing safety risks and hazards and responding to remove risks and hazards
preparing sites and equipment for installation
installing meter facilities using site specific requirements
installing meters according to client and manufacturers' requirements and conditions
identifying faults, changes and failure indicators
restoring sites to original conditions
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning or examination to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVZ05 | NWPIRR014 | Install meters for rural water supplies | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J156 | AHC32412 | Certificate III in Irrigation | Qualification |
| D245 | NWP30107 | Certificate III in Water Operations | Qualification |