Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install meters for rural water supplies

Install meters for rural water supplies

Unit of competency
National Code
NWPIRR014
State Code
AVZ05
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/12/2015
State Implementation and Classification
Approved Date
15/04/2016
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
15/04/2016
Nominal Hours
20
Description
This unit describes the skills required to install water meters for rural water supplies.This unit applies to those working as field or operational staff installing meters. The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to. Those undertaking this unit would work independently under direct supervision, while performing routine tasks ensuring minimum damage to the environment, in a familiar context.No licensing, legislative or certification requirements apply to unit at the time of publication.
Notes
Elements and Performance Criteria
1. Confirm conditions of the site for meter installation
  • 1.1 Identify the location of the site and establish client information from work plans and job specifications.
  • 1.2 Identify access to the site and any conditions of access.
  • 1.3 Assess the conditions of the site.
  • 1.4 Set out the site.
  • 1.5 Carry out a job safety analysis and identify and control hazards.
2. Install meter facilities
  • 2.1 Ensure that excavations provide sufficient width for movements of installation.
  • 2.2 Install meter as set out in design and specifications.
  • 2.3 Check fittings, seals and operation.
  • 2.4 Install ancillary equipment and check for operation and seal.
  • 2.5 Check meter installation for compliance with manufacturer specifications.
3. Restore site
  • 3.1 Backfill with suitable material, moisture content and compaction to maximise compaction efficiency.
  • 3.2 Restore the site to original site conditions.
No information
No information
Replaces
State Code National Code Title Type
D4810 NWP302A Install meters for non-potable, non-urban water supplies Unit of competency
Replaced By
State Code National Code Title Type